Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Dever Golf Cart Sales and Service Center
New Construction, Infrastructure - 16,630 SF
Conception
$2,500,000 CJ est. value
Louisville, KY 40245

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Improvements at Former Jacks Creek Pike Landfill
Infrastructure
Bidding
$400,000 CJ est. value
Lexington, KY 40515

RFQ D/B - Design-Build Construction of USDA, Forest Service, Daniel Boone National Forest, London Ranger District Office Compound
Demolition, LEED Certification, New Construction, Infrastructure - 7,500 SF
Bidding
$5,400,000 CJ est. value
London, KY 40744

Engineering Services for Bridge Design - Buffington Bridge Replacement
New Construction, Renovation
Post-Bid
Elsmere, KY

Piling/Drilling
Infrastructure
Post-Bid
Catlettsburg, KY

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Baseball Field Backstop Safety System
Results
Union, KY 41091

Arby's / Versailles
New Construction, Infrastructure - 2,460 SF
Construction
$800,000 CJ est. value
Versailles, KY 40383

RFP D/B - Design and Re-Construction of Tennis and Basketball Courts to Include Pickleball and Fencing at Richardson Road Park
Infrastructure
Construction
$489,528 CJ est. value
Independence, KY 41051

Old New Cut Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Fairdale, KY 40118

Blackburn Avenue Multi-Residential Development
New Construction, Infrastructure - 24,816 SF
Pending Verification
$6,000,000 CJ est. value
Lexington, KY 40508

Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Last Updated 11/02/2022 11:12 AM
Project Title

Black Oak Sewer Consolidation Project - Contract II (Wastewater Treatment Plant)

Physical Address View project details and contacts
City, State (County) Vanceburg, KY 41179   (Lewis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 2, 2022, construction is underway. A timeline for completion has not been confirmed. The work to be bid upon is described as follows: Contact I (Force Main & Pump Stations) - Furnishing and installation of approximately 8,400 LF of 4" force main and two (2) sewer pump stations. Contract II (Wastewater Treatment Plant) - Furnish and install; gravity sewer lines, a new precast headworks structure with screen and bypass, metering manholes, and a precast concrete activated sludge treatment plant. Time allowed for substantial completion of Contract I (Force Main & Pump Stations) is 240 calendar days. Time allowed for substantial completion of Contract II (WWTP) is 240 calendar days. CDBG #19-004 SX 21135010 Bids shall be accompanied by a certified check or bid bond payable to the Electric Plant Board of the City of Vanceburg in an amount not less than five percent (5%) of the base bid. No bidder may withdraw his bid for a period of ninety (90) days after the date bids are opened. He may, however, withdraw his bid at any time prior to the time and date scheduled for opening of same or any authorized postponement thereof. Any bid received after the time and date specified will not be considered and will be returned unopened to the bidder. The Electric Plant Board of the City of Vanceburg reserves the right to reject any and all bids and to waive formalities and any bid that is obviously unbalanced may be rejected. Time allowed for substantial completion of Contract II (WWTP) is 240 calendar days. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents