Similar Projects
System Preservation (Restoration/rehab/resurface)
Infrastructure
Bidding
$64,610,000 CJ est. value
Gold Canyon, AZ 85118

Capacity Additions (Major Widening) - Sr 101L
Infrastructure
Bidding
$160,000,000 CJ est. value
Scottsdale, AZ 85257

System Preservation (Reconstruction)
Infrastructure
Sub-Bidding
$2,700,000 CJ est. value
Florence, AZ 85132

Historic Courthouse Remodel
Build-out
Post-Bid
$11,910,820 CJ est. value
Kingman, AZ 86402

RFP D/B - Intersection Wellfield Pipeline
Infrastructure
Post-Bid
$300,000 CJ est. value
Peoria, AZ 85345

Weight Room Slab Repair - Marcos De Niza
Renovation, Infrastructure
Results
$23,532 CJ est. value
Tempe, AZ 85283

Kingman - Wickenburg Highway (Tegner St - Wickenburg Ranch W)
Infrastructure
Results
$50,966,991 CJ est. value
Congress, AZ 85332

Tangerine Road Corridor Project- Phase 2A (from I-10 through Tangerine Business Loop)
Infrastructure
Construction
$200,000 CJ est. value
Marana, AZ 85653

Install Rapid Rectangular Flashing Beacon (RRFB)
Infrastructure
Post-Bid
$114,141 CJ est. value
Gold Canyon, AZ 85118

Casa Grande - Tucson Highway (I-10) (Ina Road to Ruthrauff Road)
Infrastructure
Results
$170,988,897 CJ est. value
Tucson, AZ 85706

Northern Parkway - El Mirage Alternative Access
Infrastructure
Post-Bid
$5,385,699 CJ est. value
El Mirage, AZ 85307

Senior Campus Expansion Project
Renovation
Results
$3,292,532 CJ est. value
Bullhead City, AZ 86442

RFQ Construction Manager at Risk - Deer Valley Airport Relocate Taxiway B and Construct Connectors B6 and B9
Infrastructure
Post-Bid
$12,500,000 CJ est. value
Phoenix, AZ 85027

Phoenix-Casa Grande Highway (Riggs Road - Gila River)
Infrastructure
Results
$4,162,777 CJ est. value
Chandler, AZ 85249

Supply or Supply and Deliver Hot Asphaltic Concrete
Term Contract
Post-Bid
Prescott, AZ 86303

Last Updated 10/12/2023 08:08 AM
Project Title

Bridge Replacement

Physical Address View project details and contacts
City, State (County) Gold Canyon, AZ 85118   (Pinal County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $64,610,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is located in Pinal County, on US 60 between mileposts 227.51 and 229.57, just east of the Town of Superior. The work consists of removing existing bridge and constructing a new four span steel girder bridge on a new alignment. The work also includes reconstructing roadway approaches, constructing retaining walls, rehabilitating a tunnel, replacing guardrail, and other related work. AZDOT - System Preservation (Bridge Replacement) The amount programmed for this contract is $64,610,000 060 PN 227 H856601C 060-D(216)S & 060 PN 229 F031501C 060-D(221)T

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents