Similar Projects
IA Sac City Housing Development
Infrastructure
Bidding
$400,000 CJ est. value
Sac City, IA 50583

Event Center Parking Lot Improvements
Infrastructure
Bidding
$265,866 CJ est. value
Oelwein, IA 50662

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

2nd Street Water Main Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Durant, IA 52747

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Results
$1,991,800 CJ est. value
Des Moines, IA 50317

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Post-Bid
$390,000 CJ est. value
Carroll, IA 51401

VA District - Phase 1 Improvements
Infrastructure
Results
$3,346,000 CJ est. value
Knoxville, IA 50138

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

Chemical Building
New Construction, Infrastructure
Results
$1,707,000 CJ est. value
Eagle Grove, IA 50533

Time and Material (NTE), Commercial Plumbing Contracting
Term Contract
Post-Bid
Ames, IA 50010

Skywalk Heat Pump Replacement
Infrastructure
Results
$24,820 CJ est. value
Sioux City, IA 51101

Last Updated 08/07/2023 05:07 PM
Project Title

1st Street Water Main Replacement From Liberty St to Chestnut St

Physical Address View project details and contacts
City, State (County) Wilton, IA 52778   (Muscatine County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $256,195 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for the said improvement, as required by the Contract Documents, is generally described as follows: Water Main Replacement. City will procure materials as listed on the bid form. Each Bid shall be made on the Bid Form prepared for this purpose, which may be obtained from the Engineer. Any alteration in the official Bid Form will entitle the Owner, at its option, to reject the Bid from consideration. Each Bid shall be accompanied by a Bid Bond or a certified cashier's check, drawn on a solvent state or national bank, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, and filed in a sealed envelope separate from the one containing the Bid. The successful Bidder will be required to furnish a Performance and Warranty Bond and a Payment Bond, each in an amount equal to 100 percent of the contract price. Said bonds to be issued by a responsible Surety approved by the Owner and shall guarantee that the Principal shall promptly make payment to all persons, firms, Subcontractors, and corporations furnishing materials for or performing labor in the performance of the Work stated and the faithful performance of the contract and the terms and conditions therein contained and the guarantee and maintenance of said facilities in good repair and working conditions for not less than Two (2) year(s) from the Notice of Acceptability of such improvements by the Owner.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents