Similar Projects
Pine Ridge Job Corps Center Secondary Well and Water Tower Tank Mixer
New Construction, Term Contract, Infrastructure
Post-Bid
$250,000 to $500,000 est. value
Chadron, NE 69337

Below Ground Potable Reservoir Inspections and Cleaning
Infrastructure
Results
Lincoln, NE

Last Updated 03/11/2022 12:07 PM
Project Title

Papio WRRF Bisulfite Tankage Expansion

Physical Address View project details and contacts
City, State (County) Bellevue, NE 68123   (Sarpy County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project work will consist of installing a third bisulfite tank at Papillion Creek WRRF to add additional storage along with I&C and updated lighting in the Chemical Building.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents