Similar Projects
SR 38 Bypass From SR 38 / US 84 to SR 119
Infrastructure
Design
$20,000,000 CJ est. value
Walthourville, GA 31313

SR 38 Bypass From SR 38 / US 84 to SR 119
Infrastructure
Design
$20,000,000 CJ est. value
Walthourville, GA 31313

Bradwell Institute Tennis Court Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Hinesville, GA 31313

Islands Highway Box Culvert Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Midway, GA 31320

Gum Branch Solid Waste Convenience Center
Infrastructure
Post-Bid
GA

Outfall (NPRL) Line Extension to Taylors Creek
Infrastructure
Post-Bid
Hinesville, GA

2021 LMIG Resurfacing
Infrastructure
Results
Hinesville, GA

Bill Carter Road Roadway Improvements
Infrastructure
Results
Midway, GA 31320

Hunters Haven
New Construction, Infrastructure - 86,442 SF
Construction
$10,000,000 CJ est. value
Hinesville, GA 31313

Hunters Haven
New Construction, Infrastructure - 86,442 SF
Construction
$10,000,000 CJ est. value
Hinesville, GA 31313

Hyundai Mobis PE Systems / Richmond Hill
New Construction, Infrastructure - 500,000 SF
Pending Verification
$54,000,000 CJ est. value
Midway, GA 31320

Water System Improvements West of Csx Railroad
Infrastructure
Bidding
$2,000,000 CJ est. value
Hinesville, GA 31313

South Main Street Widening Rebid
Infrastructure
Post-Bid
$12,000,000 CJ est. value
Hinesville, GA 31313

Intersection Improvements On Us 84/Sr 38 At Old Sunbury Rd (Cr 73)
Infrastructure
Results
Midway, GA 31320

Comprehensive Maintenance Services
Infrastructure
Post-Bid

Last Updated 06/14/2023 07:02 AM
Project Title

Bridge Rehabilitation on I-95/SR 405 NBL/SBL

Physical Address View project details and contacts
City, State (County) Midway, GA 31320   (Liberty County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,287,887 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As Per the Owner the Project Has Been Deferred. Editorial Content Team is Actively Seeking Updated Information. Bridge Rehabilitation on I-95/sr 405 Nbl/sbl Over Bull Town Swamp and Over Cay Creek Tributary. Counties: Liberty District 5 - Jesup, Area Office 5 - Savannah ALL questions and comments must be submitted by the close of business of the Friday two weeks before the letting. All questions and comments received after the Friday before the week of the Letting will be documented, but a response will not be provided. For those contractors who are currently prequalified as a GDOT Construction Prequalified Contractor or Registered Subcontractor through GDOT's Construction Bidding Administration Office, and want to be prequalified to perform maintenance projects under the Routine Maintenance Services Program, there is now a modified prime contractors application form available. W e welcome you to participate. The application form and all applicable documents, resources and other guidance may be found on the GDOT website. Proposals shall only be submitted electronically as specified in the Specifications; and shall be accompanied by a proposal guaranty in the indicated amount in the form of a Certified Check, Cashiers Check or Bid Bond on the form issued by the Department. This advertisement is merely an invitation for the submission of bids which will be considered as offers for performance of work by the submitting party. The State reserves the right to reject any or all bids. The surety for bid bonds and performance and payment bonds shall be a company acceptable as surety on Federal bonds and listed in the current Federal Register and licensed in the State of Georgia. For any web site-related issues, please contact the following individual: William Dunwoody: 404-631-1147 For amendment related questions or issues regarding projects advertised, please contact the following individual: Tamara Crawford: 404-631-1728 Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. Questions or comments call (404) 631-1147 GADOT - 013 - Bridge Rehabilitation on I-95/SR 405 NBL/SBL

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents