Similar Projects
North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

Hart Road Storm Water Pond - City of Beloit
Infrastructure
Conception
$400,000 CJ est. value
Beloit, WI 53511

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Bergen - Emerald Grove RR OPS/ Crossing Repair/ Resurface
Infrastructure
Design
$250,000 CJ est. value
Clinton, WI 53525

Reconstruction of Bridge F-34, MP 13.3 Monroe Subdivision
Renovation, Infrastructure
Bidding
$1,200,000 CJ est. value
Janesville, WI 53548

Reconstruction of Bridge F-52, MP 16.7 Monroe Subdivision
Renovation, Infrastructure
Bidding
$1,200,000 CJ est. value
Orfordville, WI 53576

Shell Building at Milton and Holiday
New Construction, Infrastructure - 5,598 SF
Sub-Bidding
$1,000,000 CJ est. value
Janesville, WI 53545

Blackhawk Technical College Public Safety Training Center Education Building - Bid Package 2: Re-Bid of Drywall and Landscaping Work Packages
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Janesville, WI 53546

UWH Med Flight Hanger
New Construction, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Janesville, WI 53546

Biosolids Drying, UV Disinfection and WPCF Upgrades
Infrastructure
Results
Beloit, WI 53511

Wootton Park Pickleball Court Conversion
Infrastructure
Results
$155,000 CJ est. value
Beloit, WI 53511

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Edgerton Apartments
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Edgerton, WI 53534

Henderson Avenue Storm Water Pond - City of Beloit
Infrastructure
Conception
$975,000 CJ est. value
Beloit, WI 53511

Last Updated 02/22/2023 11:31 PM
Project Title

Woodmans Sport & Convention Center DD Budget

Physical Address View project details and contacts
City, State (County) Janesville, WI 53545   (Rock County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

This is a budgetary pricing round for the Woodman's Sports & Convention Center (WSCC). Construction will be the demolition of the existing Sears building currently attached to the Uptown Janesville mall. Project Details: The WSCC would be a versatile facility, equipped for a range of community events with: •Main Arena - 1,500 Spectator Capacity - Year-round ice for hockey, skating, and other activities •Multi-Purpose Arena - 250 Spectator Capacity - Adjustable Space - Featuring ice, hardcourt flooring, and indoor turf •Multi-Use/Conference Space - 20,000 square feet - Space for trade shows, conventions, expos, banquets, and community events - Space for basketball courts, volleyball courts, pickleball, open gym, and more •New Parking Lot “All qualified applicants/bids will receive consideration for employment without regard to race, color, creed, religion, national origin, sex, sexual orientation, disability, age, marital status, status with regard to public assistance, protected veteran status, or any other protected characteristic. Kraus-Anderson® Construction Company is an Equal Opportunity Employer and hereby provides notice of its compliance with 41 C.F.R. 60-1.4; 41 C.F.R. 60-4.2; 41 C.F.R. 60-4.3; 41 C.F.R. 60-250.5; 41 C.F.R. 60-300.5; 41 C.F.R. 60-741.5; 41 C.F.R. 61-300.10; and 29 C.F.R. Part 471 Appendix A to Subpart A, which are hereby incorporated by reference.” *Documents are DD Budget.

Details

125,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents