Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

HVAC Parts and Supplies
Alteration
Post-Bid
Chicago, IL

Pre-Purchase of A Chiller
Alteration
Post-Bid
Palatine, IL

Des Plaines HVAC Improvements
Results
Des Plaines, IL

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

HVAC Service Contract
Alteration
Post-Bid
Oak Park, IL 60304

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

2022 Four Schools (Chiller Pre-Purchase)
Alteration
Post-Bid
Mount Prospect, IL 60056

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

2022 Summer Work - Bid Period 002 - Mechanical Equipment
Alteration
Post-Bid
Winnetka, IL

J041--Repairs need to HVAC System(578)
Term Contract
Results
Hines, IL

HVAC Equipment Pre-Purchase
Alteration
Post-Bid
IL

2021 Pool RTU Replacement
Alteration
Results
Streamwood, IL 60107

2022 ESC - HVAC Equipment Pre-Purchase
Alteration
Post-Bid
Skokie, IL

Last Updated 03/23/2023 12:34 PM
Project Title

Install New A/C Units and New Building Automation Systems

Physical Address View project details and contacts
City, State (County) Jacksonville, IL 62650   (Morgan County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $2,800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project has canceled This project is Phase 1 of the replacement of building automation system, packaged air cooled chillers and partial HVAC systems. General under $ 400,000 Heating under $ 2,000,000 Electrical under $ 400,000 CDB bid envelopes can be used to mail bid documents to CDB Springfield if bidding firms have access to them. Otherwise, the CDB Project Number, the Trade, and the Bid Date should be included on the outside of the mailing envelope. Bids can be sent via the US Post Office, UPS, or FEDEX, and should be sent without a signature required at delivery. Mailed bids will be considered on-time if the package is in CDBs mail received on, or before, the THURSDAY morning following the bid receipt deadline. No confirmation of delivery will be provided to the contractor by CDB. Minority, Women, Persons with Disabilities, and Veteran Business Subcontractor/Supplier Participation is Applicable 4 % MBE/WBE, 0% PBE/VBE. DESCRIPTION: Five ISD Buildings are included in this phase of the project. 1. Wait Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 2. Vocational Building - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 3. Officer Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 4. Physical Plant - This work will include, but is not limited to, upgrading the existing BAS file server and software to provide electronic communication to and from the new BAS in the listed building above. It will also include integrating the new BAS from the buildings listed. 5. Cullom Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled package chiller and chilled water pumps, fan coil units and appurtenances. Substantial Completion - 196 consecutive calendar days + final completion- 30 consecutive calendar days from the date of Substantial Completion.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents