Similar Projects
Wc 1349-Madison Street Area-30-Inch Water Main Rehabilitation
Alteration
Bidding
$4,000,000 to $5,000,000 est. value

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Task Order No. 77 - Riggs Road Water Main Replacement
Post-Bid
$1,000,001 to $2,500,000 est. value
Hyattsville, MD 20780

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Saint Clair 16 Water Main Replacement
Results
MD

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Patuxent Raw Water Pipeline Phase I and Phase II
Results
Less than $10,488,180 est. value
Laurel, MD 20707

Water Line Installation Fraternity Row
Infrastructure
Post-Bid
$100,000 to $500,000 est. value
College Park, MD 20740

Largo Road Transmission Water Main Replacement
Results
Laurel, MD 20707

Domestic Water Valve Vault
Infrastructure
Post-Bid
College Park, MD 20742

Cherry Hill Water Main Replacement
Results
Laurel, MD 20707

Water Systems Preventive Maintenance, and Service Repairs.
Term Contract
Post-Bid
Beltsville, MD 20705

Maintenance and Repair Services To Pure Water Systems
Results
Beltsville, MD

Heather Hills Water Main Rehabilitation
Results
Bowie, MD 20715

Task Order 66 Randolph Street Water Main Replacement
Results
Bladensburg, MD

Reported 02/28/2022 09:28 AM
Project Title

Marlboro Zone Reinforcement Old Marlboro Pike

Physical Address View project details and contacts
City, State (County) Upper Marlboro, MD 20772   (Prince Georges County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Project: Project consists of a water transmission main extension and the installation of a new flow control valve and vault to interconnect the 280A and 385B Pressure Zones. The water main extension includes the installation approximately 4,060 linear feet of 16-inch coated, ductile iron water main; 28 linear feet of 14-inch coated, ductile iron water main; 198 linear feet of 12-inch coated, ductile iron water main; 82 linear feet of 8-inch coated, ductile iron water main; 34 linear feet of 6-inch coated, ductile iron water main. The flow control valve and vault include new 6-inch and 12-inch flow control valves, two (2) 6-inch plug valves, two (2) 12-inch plug valves, a cast-in-place concrete vault, and associated electrical, mechanical, and instrumentation components. The Contractor shall provide all materials, except for the water main and water fittings, associated with the Flow Control valve and vault, inclusive of all structural, mechanical, electrical, instrumentation, and site/civil improvements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents