Similar Projects
RFP - Professional Engineering Services
Term Contract
Conception
$1,700,000 CJ est. value
Agawam, MA 01001

Foolish Hill Underground Storage Tank - Town of Mansfield
Infrastructure
Conception
$600,000 CJ est. value
Mansfield, MA 02048

Water Storage Tank Construction
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Hopedale, MA 01747

Dover Community Center
Addition, Demolition, New Construction, Infrastructure, Renovation - 20,000 SF
Bidding
$17,500,000 CJ est. value
Dover, MA 02030

New Biofilter for EQ/Sludge Tank
Infrastructure
Post-Bid
Wareham, MA 02571

Water Storage Facility - Smith Neck Road Elevated Tank
Infrastructure
Post-Bid
$1,500,000 est. value
Dartmouth, MA

Stony Brook Hot Water Tank and Oil Burner
Alteration
Results
Orleans, MA

Water Tank Ladder Replacement
Infrastructure
Results
$40,000 est. value
Spencer, MA

Removal of Oil Tank at Amherst Regional Middle School
Infrastructure
Construction
$70,975 CJ est. value
Amherst, MA 01002

Lebanon Avenue Water Tank Improvements/Painting - 2023-707 - City Of Pittsfield
Renovation
Conception
$1,000,000 CJ est. value
Pittsfield, MA 01201

Beach Plum Motor Lodge Septic Installation
Infrastructure
Bidding
$90,000 CJ est. value
Eastham, MA 02642

Water Filter Plant Bulk Tank Installation
Infrastructure
Post-Bid
$15,000 est. value
Southbridge, MA

Rehabilitation of the Pipestave Prestressed Concrete Tank
Infrastructure
Results
$190,000 est. value
West Newbury, MA

Rehabilitate Water Storage Tank on Ides Hill Phase 1B Construction - City of Attleboro
Renovation
Conception
$1,550,000 CJ est. value
Attleboro, MA 02703

Bradford Street Water Storage Tank Mixer
Infrastructure
Bidding
$530,000 CJ est. value
North Andover, MA 01845

Last Updated 03/31/2023 02:38 AM
Project Title

Mary Dunn 1 Water Storage Tank Repainting - Town Of Barnstable

Physical Address View project details and contacts
City, State (County) Barnstable, MA 02630   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $927,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Mary Dunn 1 water storage tank repainting project will repaint the interior and exterior of the tank. As of March 31, 2023, this project is currently in the FY 2024-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents