Similar Projects
O'Reilly Auto Parts
New Construction - 7,225 SF
Design
$500,000 to $900,000 est. value
Mission, TX 78574

Walmart Supercenter #3567-225 - Entertainment Optimization
Renovation - 18,693 SF
Design
Hidalgo, TX 78557

Target #824 Grocery Pick Up
Renovation
Post-Bid
McAllen, TX 78503

Target Cafe #1490 Grocery Pickup
Renovation
Post-Bid
McAllen, TX 78504

Public Works Solid Waste Office Renovations
Renovation
Results
Less than $35,000 est. value
McAllen, TX 78504

Construction of New Mechanic's Shop for Precinct 4
New Construction
Results
Less than $1,808,000 est. value
Palmview, TX 78539

Region One Education Service Center
Renovation, Addition - 25,672 SF
Construction
Edinburg, TX 78541

Shops at 29 - Shell Building
New Construction - 25,030 SF
Construction
McAllen, TX 78501

Walmart Supercenter #5809-227 - Entertainment Optimization
Renovation - 18,599 SF
Design
Edinburg, TX 78542

Target Cafe #2224 Grocery Pickup
Renovation
Post-Bid
McAllen, TX 78504

Gemini One Distribution Center
New Construction - 242,198 SF
Construction
$10,000,000 CJ est. value
Pharr, TX 78577

Walmart Supercenter #3886-234 - ENTERTAINMENT OPTIMIZATION
Renovation - 20,387 SF
Design
Edinburg, TX 78539

Rio Bank - 3rd Floor Lease Space
Build-Out - 5,192 SF
Post-Bid
McAllen, TX 78501

Retail Shell Building - Shops at HEB
New Construction - 15,824 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
San Juan, TX 78589

Walmart Supercenter #397-252 - Entertainment Optimization
Renovation - 20,048 SF
Design
McAllen, TX 78503

Last Updated 07/14/2021 02:00 PM
Project Title

Weslaco Shell Building - Phase I

Physical Address View project details and contacts
City, State (County) Weslaco, TX 78596   (Hidalgo County)
Category(s) Commercial
Sub-Category(s) Office, Retail
Contracting Method
Project Status Construction Commenced September 2020, Construction Complete as of second quarter 2021
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes ground-up construction of a tilt-wall building.

Details

1 Retail, 1 Story Above Grade, 9,697 SF New Construction, Office.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents