Similar Projects
Summerville Prepatory Academy
New Construction - 43,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Summerville, SC 29485

Whittemore Park Middle School Replacement
New Construction
Conception
Conway, SC 29527

First Baptist Church Education Building
New Construction
Design
Charleston, SC

New K8 School
New Construction - 100,000 SF
Design
$30,000,000 est. value
SC 29730

Districtwide Renovations - Lexington Four School District
Renovation
Bidding
Swansea, SC

Portable Concession Buildings for 3 Middles Schools
New Construction - 224 SF
Bidding
Fort Mill, SC 29715

North Central Elementary Subcontractors and Materials Suppliers
Sub-Bidding
Kershaw, SC 29067

Whitmire Community School Kitchen Renovations
Renovation
Post-Bid
Whitmire, SC 29178

Beaufort Elementary School Renovations Construction Management - CM at Risk
Renovation
Post-Bid
Beaufort, SC 29902

Construction Management at Risk Services for Capital Improvements Program
New Construction, Renovation
Results
Abbeville, SC 29620

Construction Management at Risk Services for Capital Improvements Program
New Construction, Renovation
Results
Abbeville, SC 29620

Hilton Head Christian Academy
New Construction - 93,000 SF
Construction
$15,000,000 est. value
Bluffton, SC

Hilton Head Christian Academy
New Construction - 93,000 SF
Construction
$15,000,000 est. value
Bluffton, SC

Facilities New Construction Howard Adult Renovation and Mike Johnson Park Renovation
New Construction, Renovation
Post-Bid
Less than $5,000,000 est. value
Georgetown, SC 29440

Construction Manager at-Risk Services for the Addition to Carver Lyon Elementary School
Addition
Results
Less than $6,000,000 est. value
Columbia, SC 29204

Reported 09/17/2021 11:19 AM
Project Title

Additions and Renovations to the McCarthy Teszler School

Physical Address View project details and contacts
City, State (County) Spartanburg, SC 29307   (Spartanburg County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method
Project Status Construction Commenced June 2021
Bids Due View project details and contacts
Estimated Value $11,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents