Similar Projects
Joshua Tree National Park Improvements
Renovation, Addition - 11,000 SF
Conception
Joshua Tree, CA

Tennis and Pickleball Court Renovations
Renovation
Bidding
$105,000 est. value
San Bernardino, CA 92407

Sport Court Resurfacing PM 1920-3
Renovation
Bidding
$60,000 est. value
Ontario, CA

Central Park Dog Park
New Construction
Post-Bid
$3,000,000 est. value
Rancho Cucamonga, CA 91730

Great Park Phase One
New Construction
Post-Bid
$48,000,000 est. value
Ontario, CA 91764

Construction of City of Fontana South Fontana Park
New Construction
Results
$15,760 est. value
Fontana, CA 92335

Installation of Playground Equipment for Flag Hill Veterans Memorial Park
Renovation
Results
Yucaipa, CA 92399

Synthetic Track Resurface at Riverside Preparatory High School
Renovation
Post-Bid
$475,000 est. value
Oro Grande, CA 92368

Marconi Park Football Field Renovation and Site Improvements
Renovation
Results
$675,000 to $700,000 est. value
Adelanto, CA 92301

9/11 Memorial Park
New Construction
Post-Bid
$500,000 est. value
Rancho Cucamonga, CA 91730

Sport Court Resurfacing PM 1920-3
Renovation
Results
$40,000 est. value
Ontario, CA 91764

Purchase and Installation of Stand-Alone Playground Equipment for Duke Watkins Park
New Construction
Post-Bid
$300,000 est. value
Needles, CA 92363

Orange Blossom Trail Phase 3
Renovation, Alteration
Results
Redlands, CA 92373

lack Rock Nature Center Rehabilitation - Siding Repair and Refinish
Renovation - 2,700 SF
Post-Bid
$100,000 to $250,000 est. value
Yucca Valley, CA 92284

Playground Site Work at Riverside Preparatory Elementary School
New Construction
Results
$1,200,000 est. value
Oro Grande, CA 92368

Reported 07/08/2022 12:00 AM
Project Title

Luckie Pool Replacement

Physical Address View project details and contacts
City, State (County) Twentynine Palms, CA 92277   (San Bernardino County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Park/Playground, Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022, Construction Completion Expected May 2023
Bids Due View project details and contacts
Estimated Value $3,780,000
Plans Available from Construction Manager - 06/15/22
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work and new construction of a mixed-use development in Twentynine Palms, California. Working plans call for the demolition of a swimming pool; playground / park / athletic field; for the construction of a swimming pool; 1,018-square-foot, one-story above grade playground / park / athletic field; and for site work for a swimming pool. Project No. 544-21558 22-01-054 Demolition and replacement of the existing community pool, pool deck and ancillary mechanical equipment building. New site improvements include fencing, gates, and a new sidewalk. The new 1,018 sf ancillary building will include two ADA-compliant uni-sex restrooms with showers, two chemical storage rooms and a mechanical room. As of June 30, 2022, this project is out for rebid for #06 Pool. The project originally bid on May 26, 2022. It has not been disclosed that the remaining bid packages have been awarded. A timeline for construction has not been confirmed. The Contract Time is 261 of calendar days from the start of construction. Bid Results :: Company name "A to Z Grading & Excavation"was unable to verify. Demolition and Earthwork :: A to Z Grading & Excavation $ 98,805.00 Concrete: Structural & Sit :: Inland Building Construction Companies, Inc. $ 290,000.00 Plumbing: Site & Bldg., and Fire Sprinkler :: Pro-Craft Construction, Inc. $ 522,000.00 Electrical & Low Voltage :: F.E.C. Electric, Inc. $ 91,225.00 General Package :: Bogh Engineering, Inc. $ 730,240.00 Pool :: California Waters (fountains/water features) $ 2,832,211.00 Masonry :: Masonry Concepts, Inc. $ 230,000.00 *The solicitation below is kept for reference* ________________________________________________________________________________________________________________________________________________________________________________________ Bid Categories: Budget (Base Bid) License Bid Category #01 - Demolition and Earthwork - $90,000 - A or C12 and C21 Bid Category #02 - Concrete: Structural & Site - $120,000 - C8 Bid Category #03 - Plumbing: Site & Bldg., and Fire Sprinkler - $240,000 - C16 and C36 Bid Category #04 - Electrical & Low Voltage - $110,000 - C10 Bid Category #05 - General Package - $390,000 - B Bid Category #06 - Pool - $2,660,000 - C53 Bid Category #07 - Masonry - $170,000 - C29 RFI's must be submitted by May 10, 2022 to eruvira@tilden-coil.com cc: jperezchica@tilden-coil.com The City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. Post-bid Interview Schedule: 1. BC 01: Demolition & Earthwork_________________ 05/27@ 7:00am 2. BC 02: Structural Concrete_____________________05/31@ 8:30am 3. BC 03: Plumbing, Site & Bldg & Fire Sprinklers_____ 05/27@ 11:30am 4. BC 04: Electrical & Low Voltage ________________ 05/27@ 11:00am 5. BC 05: General Package______________________ 05/31@ 10:00am 6. BC 06: Pool_________________________________05/27@ 10:00am 7. BC 07: Masonry______________________________05/27@ 1:00pm

Details

Athletic Facility, 1,018 SF New Construction, Park/Playground, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting, Special Coatings, Cementitious Coatings.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents