Similar Projects
8.06 Mi of Hot Mix Asphalt Cold Milling and Resurfacing, Median Crossover, Widening, Aggregate Base Drainage, Signing and Pavement Markings
Infrastructure
Bidding
Zeeland, MI 49464

2020 Street Resurfacing Project
Post-Bid
Grand Haven, MI

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Big Rapids, Canton, Fort Gratiot, Gaylord, Holland, Muskegon, Rochester Hills, Southgate, Sterling Heights, Warren, Ypsilanti, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

1.60 MI of Hot Mix Asphalt Shared use Path, Earthwork, Restoration and Pavement Markings
Results
MI

USCG STA Grand Haven Parking Lot Resurface
Post-Bid
Grand Haven, MI 49417

Cooper Van-Wieren Parking Improvements
Results
Holland, MI

Hager Park Paving Renovation
Post-Bid
Less than $150,000 est. value
Jenison, MI 49428

0.85 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Sidewalk Ramps and Pavement Markings
Results
MI

GHAPS High School Egress Road
Post-Bid
Grand Haven, MI 49417

Quincy Street Non-Motorized Pathway
Results
Less than $275,549 est. value
Holland, MI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

0.40 MI of Hot Mix Asphalt Reconstruction, Concrete Curb and Gutter, Sidewalk and Ramps, Storm Sewer and Pavement Markings on Fulton Avenue From Albee Street to Beechtree Street
Results
Grand Haven, MI 49417

Central Division - Asphalt Paving Maintenance
Post-Bid

5.05 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Full and Partial Depth Concrete Pavement Joint Repairs, Concrete Sidewalk
Results
MI

Last Updated 07/16/2021 08:41 AM
Project Title

Pottawattomie Park - 2021 CZM Grant Improvements

Physical Address View project details and contacts
City, State (County) Grand Haven, MI   (Ottawa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: Removal of an existing wood retaining wall, concrete sidewalk, wood boardwalk, and wood pilings. Installation of new concrete sidewalk, wood pilings, boardwalk, segmental retaining wall, boulder walls, natural shoreline, and restoration seeding and plantings. Including all necessary appurtenances and restoration

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents