Similar Projects
Hillcrest Community Center - 390398 - City of Kansas City
Renovation
Conception
$270,000 est. value
Kansas City, MO 64134

Lake of the Woods Recreation Area Improvements - 2143 - City of Columbia
New Construction, Infrastructure, Renovation
Conception
$700,000 CJ est. value
Columbia, MO 65202

Americare Senior Living / Jefferson City
New Construction, Infrastructure
Design
$5,506,601 CJ est. value
Jefferson City, MO 65101

Normandie Golf Club Re-Development
Demolition, New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Normandy, MO 63121

Existing Building Upgrades
Renovation
Bidding
$275,000 CJ est. value
Williamsville, MO 63967

The City of Hartville (aka Hartville Community Center Renovation)
Renovation
Bidding
$404,833 CJ est. value
Hartville, MO 65667

Aurora Recreation and Event Center
New Construction, Infrastructure
Sub-Bidding
$17,500,000 CJ est. value
Aurora, MO 65605

Jennings City Center and Community Center
New Construction, Infrastructure - 15,000 SF
Post-Bid
$14,000,000 CJ est. value
Jennings, MO 63136

Mayor's Nights / Club
Renovation
Post-Bid
Kansas City, MO

State Tech - Golf Clubhouse
New Construction - 31,500 SF
Results
Linn, MO 65051

Conference Room Remodel
Build-out
Results
$25,444 CJ est. value
Ferguson, MO 63135

Hillvale Apartments
New Construction, Renovation, Infrastructure - 132,989 SF
Construction
$36,500,000 CJ est. value
Saint Louis, MO 63120

The Chabad Jewish Center / St Charles County
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cottleville, MO 63366

ERC Mixed-Use Development
New Construction, Infrastructure - 1,000 SF
Pending Verification
$20,500,000 CJ est. value
Wildwood, MO 63040

Hillcrest Community Center - 390398 - City of Kansas City
Renovation
Conception
$270,000 CJ est. value
Kansas City, MO 64134

Last Updated 09/27/2023 02:08 PM
Project Title

City of Kirkwood Community Center Renovations

Physical Address View project details and contacts
City, State (County) Kirkwood, MO 63122   (Saint Louis County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $8,292,100 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope includes but is not limited to renovation of a facility for use as a community center. Work to include renovation of entry, lobby, restrooms, elevator and gyms on Level 1. Renovation of meeting rooms and restrooms on Levels 2 & 3. New pavilion, site work and other work indicated in documents. PHASED CONSTRUCTION Construct the Work in phases, with each phase substantially complete as indicated below. Phase 1: Includes renovations to the West Gymnasium, first floor lobby, ice rink warming and dining room, ice rink restrooms, sitework and exterior. Work of this phase shall commence on March 1st, 2024. Substantial Completion: By August 1st, 2024 Phase 2: Perform the remaining Work including renovations to the East Gym, first floor restrooms, elevator, 2nd floor and 3rd floor. Work of this phase shall commence on September 1st, 2024. Substantial Completion: By August 1st, 2025 Project Final Completion: By September 1st, 2025 See Specification 00 24 13 Bidders Scope of Work for additional schedule requirements. terested bidders are to download the Request for Proposal from the City of Kirkwood's EProcurement Platform by registering at https://kirkwoodmo.ionwave.net. The City reserves the right to reject any or all of the bids, to waive technicalities, to award on any bid that is most advantageous, and to make investigations concerning the experience and ability of the bidder to perform the work. Questions regarding the bid should be submitted to Katie Aholt at katie@navigatebuildingsolutions.com or by calling (636) 359-838. Question Deadline 08/11/2023 at 5:00 PM CT All questions are due by 5 can only be submitted through the City of Kirkwood's e-Procurement Platform, Ionwave, at https://kirkwoodmo.ionwave.net

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents