Similar Projects
Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

New Junior High School
New Construction - 140,000 SF
Conception
$57,000,000 est. value
Mahomet, IL

Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2023 Construction Projects
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Cairo, IL 62914

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

AERO Therapeutic Center Bid Release 01
Renovation
Post-Bid
Burbank, IL 60459

Cosmetology/ Barber Studio
Renovation
Results
Chicago, IL

2021 Improvements at Fierke and Kruse Education Centers
Renovation
Results
Oak Forest, Orland Park, IL 60452

LIFT Innovation Center
Renovation - 49,700 SF
Construction
Mattoon, IL 61938

Bnei Ruven High School - Religious Assembly Building Addition
Addition, Demolition, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Chicago, IL 60659

Mahomet-Seymour High School Renovation
Addition - 35,000 SF
Conception
$21,000,000 est. value
Mahomet, IL 61853

Living Hope Church Elk Grove Village
Addition
Design
$2,600,000 CJ est. value
Elk Grove Village, IL 60007

Molloy Education Center
Renovation, Addition
Post-Bid
Morton Grove, IL 60053

Tilton ICR
Renovation
Results
Chicago, IL

Last Updated 01/04/2023 12:44 PM
Project Title

Centralia High School Improvements

Physical Address View project details and contacts
City, State (County) Centralia, IL 62801   (Marion County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $6,194,400 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated cost of construction is $6-7 million. The Centralia High School Improvements project consists of: approximately 22,000 sf of renovation and addition to the existing high school campus. Project includes renovation of existing high school restrooms, renovation to existing high school office, addition to high school office, renovation to existing science labs and classroom addition connecting existing high school building to the existing ag building. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents