Similar Projects
Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

Urbana at Juniper Pointe
New Construction
Design
San Antonio, TX 78253

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

Renovations and New Pavement
Infrastructure
Results
$750,904 est. value
San Antonio, TX

Roosevelt Avenue (I-10 to South Street Mary's Street)
Infrastructure
Results
$4,053,000 est. value
San Antonio, TX 78275

Package 2 SAWS NE Operation Center and NE Service Center
New Construction, Infrastructure
Construction
$250,000 CJ est. value
San Antonio, TX 78205

Waters Edge I / Building A
New Construction, Infrastructure - 105,702 SF
Construction
$18,600,000 CJ est. value
San Antonio, TX 78235

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Roof Top Unit Replacements (5 sites) - 2022 Bond - Northside Independent School District
Infrastructure
Conception
$9,400,000 CJ est. value
San Antonio, TX 78205

Alamo Residences at Stone Oak
New Construction - 226,248 SF
Design
$10,000,000 CJ est. value
San Antonio, TX 78258

Pavement Repairs for Berman and Citrus Roads Project
Infrastructure
Post-Bid
San Antonio, TX 78226

Last Updated 06/27/2023 02:10 PM
Project Title

Pavilion Culebra Apartments

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78228   (Bexar County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $35,000,000 [brand] Estimate
Plans Available from Developer
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes construction of a new apartment complex consisting of three buildings totaling 245,565 and a 5,866 sf clubhouse and maintenance building. As of June 1, 2023, the project is out for rebid: Scope of Work The following is a preliminary list of bid line items arranged by division to be used as a guide. Subcontractors and Vendors are responsible for verifying their individual scope of work based on the Bidding Documents. 01 GENERAL REQUIREMENTS - 02 EXISTING CONDITIONS - 03 CONCRETE - 04 MASONRY - 05 METALS - 06 WOOD, PLASTICS, & COMPOSITES - 07 THERMAL & MOISTURE PROTECTION - 08 OPENINGS - 09 FINISHES - 10 SPECIALTIES - 11 EQUIPMENT - 12 FURNISHINGS - 13 SPECIAL CONSTRUCTION - 14 CONVEYING - 21 FIRE SUPPRESSION - 22 PLUMBING - 23 HVAC - 26 ELECTRICAL - 27 COMMUNICATIONS - 28 ELECTRONIC SAFETY & SECURITY - 31 EARTHWORK - 32 EXTERIOR IMPROVEMENTS - 33 UTILITIES All bidders must be in good standing with Pavilion Construction. If not previously submitted, bidders shall complete and submit with proposal. All bids shall provide material, labor, and equipment that conform to the project construction documents and material specifications. This is a DAVIS BACON Project. Anticipated project start date is October 2023. Construction is expected to complete around August 1, 2025.

Details

,, 222,588 SF - 3 Stories Above Grade, 216,722 SF. 2 Stories Above Grade, 5,866 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents