Similar Projects
Shared-Use Paths, and Sidewalks
Infrastructure
Conception
Moline, IL

Lake Marian Road Resurfacing Project
Infrastructure
Bidding
$300,000 est. value
Carpentersville, IL 60110

2022 Road Construction Season - Crack Sealing
Infrastructure
Bidding
$140,000 est. value
Lisle, IL

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

Adams Street to Main Street Pathway Replacement
Post-Bid
Oswego, IL 60543

3P Policy Standard Overlay ADA Improvements from W of Commerce Pkwy to 0.1 Mi N of E Washington
Results
IL

ADA Improvement Project along Various State Maintained Routes
Results
Fox Lake, Grayslake, Lake Villa, Richmond, Winthrop Harbor, IL

Parking Lot Work Various Schools
Infrastructure
Bidding
$80,000 est. value
Country Club Hills, IL 60478

2021 District Wide Emulsion-Based Parking Lot and Trail Sealcoating
Post-Bid
Naperville, IL

(1,444-Ft.) Smart Overlay and ADA Ramp Improvement
Results
Chicago, IL

DCEO Sidewalks
Infrastructure
Bidding
$460,000 est. value
Princeton, IL

Concrete Parking Lot
Post-Bid
Monticello, IL 61856

ADA Improvements, Traffic Signal Replacements, Storm Sewer Work and Sign Replacements, Storm Sewer Work and Sign Replacements on IL 16 and IL 127 in Hillsboro
Results
Hillsboro, IL 62049

Commissioners Park Trail Renovation
Infrastructure
Bidding
$125,000 est. value
Naperville, IL 60564

North Parking Lot Improvements
Renovation
Post-Bid
Clinton, IL 61727

Reported 05/17/2022 12:00 AM
Project Title

Carroll Apartments Housing Units 2022 Sidewalk and Patio Replacements

Physical Address View project details and contacts
City, State (County) Savanna, IL 61074   (Carroll County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes removing 4,060 square feet of concrete sidewalk and patio surfaces, furnishing and installing 5,428 square feet of 5 inch Portland cement concrete patio surfaces and sidewalks, furnishing and installing 350 linear feet of 6 inch solid and perforated pipe, 3 - 60 inch precast manhole sections as part of a dry sump system, shaping and grading and other incidental work at Carroll Apartments housing units located at 2009 Wacker Road, Savanna, Illinois.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents