Similar Projects
Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Lindale Trail Phase II from I-380 to Council Street North East
Design
$1,200,000 est. value
Cedar Rapids, IA

Main Street Reconstruction - City of Cedar Falls
Infrastructure
Design
$12,025,000 est. value
Cedar Falls, IA 50613

Iowa Central Community College - RFQ Construction Management at Risk Services
New Construction, Renovation, Infrastructure
Bidding
Storm Lake, IA 50588

Mount Vernon Community School District Activities Complex
New Construction, Infrastructure - 571,421 SF
Bidding
$5,736,445 CJ est. value
Mount Vernon, IA 52314

Meskwaki Pedestrian Trail
Infrastructure
Post-Bid
Tama, IA

Proposed Street Improvements - Middle Street and Prairie Street Paving
Infrastructure
Post-Bid
Mediapolis, IA 52637

Clover Lane Overlay
Results
Asbury, IA

8th Avenue South West from 15th Street South West to Rockford Road
Results
$3,220,000 est. value
Cedar Rapids, IA 52407

East 14th Street Warehouse Distribution Center
New Construction, Infrastructure - 1,050,260 SF
Pending Verification
$114,000,000 CJ est. value
Des Moines, IA 50309

Shaw Street and SE 6th Storm Sewer Improvements
Infrastructure
Pending Verification
$700,000 CJ est. value
Des Moines, IA 50309

Justin Drive Preservation 100th Street to 109th Street - ST22-02 - City of Urbandale
Infrastructure
Conception
$1,100,000 CJ est. value
Urbandale, IA 50322

New Fire Station / City Hall - Missouri Valley City
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Missouri Valley, IA 51555

2023 Midblock Pedestrian Signal Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Des Moines, IA 50313

Last Updated 09/22/2022 04:09 PM
Project Title

Grinnell Water Quality Project - Permeable Pavement Parking Lot

Physical Address View project details and contacts
City, State (County) Grinnell, IA 50112   (Poweshiek County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The location of the work to be done and the kinds and sizes of materials proposed to be used are as follows: Construct Grinnell Water Quality Project - Permeable Pavement Parking Lot including all labor, materials and equipment necessary to construct approximately 670 square yards of 8.5-inch Pervious PCC Pavement, 410 cubic yards of excavation, pavement removal, subgrade preparation, filter aggregate, subdrain, surface restoration, erosion control, testing, mobilization, traffic control and miscellaneous work, including cleanup. All work and materials are to be in accordance with the proposed plans, specifications, form of contract and estimate of cost now on file in the office of the City Clerk of Grinnell, Iowa, and by this reference made a part there of as though fully set out and incorporated herein. All proposals in connection therewith shall be submitted to the City Clerk of said City on or before the time herein set for said letting. All proposals shall be made on official bidding blanks furnished by the City, and any alterations in the official form of proposal will entitle the Council, at its option, to reject the proposal involved from consideration. Each proposal shall be sealed and plainly identified. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of five percent (5%) of the bid. The bid security should be made payable to the CITY OF GRINNELL, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and other contract documents. Bidders shall use the bid bond form bound in the specifications. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa Statutes. The City Council reserves the right to reject any or all bids and to waive informalities or technicalities in any bid and to accept the bid which it deems to be in the best interest of the City. The Council reserves the right to defer acceptance of any proposal for a period not to exceed thirty (30) calendar days from the date of letting. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. The work will commence within ten (10) days after date set forth in written Notice to Proceed and shall be completed no later than October 31, 2023. Liquidated damages in the amount of Two Hundred Dollars($200.00) per consecutive calendar day will be assessed for each day that work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Payment to the Contractor for said improvements will be made in cash derived from the proceeds of the issuance and sale of such bonds and/or from such cash funds of the City as may be legally used for said purposes. Any combination of the above methods of payment may be used at the discretion of the City Council. Payment to the Contractor will be on the basis of monthly estimates equivalent to ninety-five percent (95%) of the contract value of the work completed and payments made to material suppliers for materials ordered specifically for the project or delivered to the site during the preceding calendar month. Estimates will be prepared approximately 10 days prior to the first Monday of the following month by the Contractor, subject to the approval of the Engineer, who will certify to the City for payment. The City reviews and approves estimates on the first Monday of the month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Upon completion of the work and its acceptance by the Council, the Contractor will be paid an amount which, together with previous payments, will equal ninety-five percent (95%) of the contract price of the contract. Final payment of the remaining five percent (5%) will be made not less than thirty one (31) days after completion and acceptance by resolution of the City Council of the completed contract, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa, as amended. No such partial or final payments will be due until the Contractor has certified to the City that the materials, labor and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents