Similar Projects
Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

Pardeeville - Manchester Const/ Structure Replacement
Infrastructure
Conception
$1,000,000 CJ est. value
Ripon, WI 54971

Summit Automotive Vehicle Service and Repair
New Construction, Infrastructure - 11,485 SF
Design
$2,500,000 CJ est. value
Fond du Lac, WI 54937

Aurora Medical Center Fond du Lac
Addition, New Construction, Infrastructure - 70,000 SF
Design
$67,000,000 CJ est. value
Fond du Lac, WI 54937

2023 Seal Coating Program
Infrastructure
Bidding
$233,000 CJ est. value
Fond du Lac, WI 54935

Replace Pavement from I-43 to 8th Street, downtown City of Manitowoc - Calumet/Washington, C Manitowoc
Infrastructure
Post-Bid
$12,000,000 CJ est. value
Metomen, WI 54971

Road Work - Cold Mix, Paver Wedging and Hot Oil Seal Coating on Various Roads
Infrastructure
Post-Bid
$400,000 CJ est. value
Eldorado, WI 54932

Eden Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$5,318,000 CJ est. value
Eden, WI 53019

Eden Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$5,318,000 CJ est. value
Eden, WI 53019

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Horse Campground Entrance Road Reconstruction
Infrastructure
Construction
$353,654 CJ est. value
Campbellsport, WI 53010

Froedtert Health and ThedaCare
New Construction, Infrastructure - 18,000 SF
Pending Verification
$35,000,000 CJ est. value
Fond du Lac, WI 54935

Replace/Rebuild D Barn - Fond du Lac County
Demolition, New Construction, Infrastructure
Conception
$350,000 CJ est. value
Fond du Lac, WI 54935

Cold Mix Paver Wedging and Hot Oil Chip Seal Coating
Infrastructure
Design
$200,000 CJ est. value
Empire, WI 54937

2022 Tennis, Pickleball, & Basketball Court Reconstruction
Infrastructure
Post-Bid
$60,000 CJ est. value
Fond du Lac, WI 54935

Last Updated 04/08/2023 09:31 PM
Project Title

Lincoln Avenue Storm Water Lift Station Upgrade - Contract A

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54935   (Fond du Lac County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $7,319,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Sewer Inspection/Rehabilitation, Sewer Pump Station, Sewer Force Main, Plumbing, Street/Road Asphalt Resurfacing and Milling, Sawcutting/Sidewalk/Pavement, Street/Road Asphalt Milling, Sewer and Water Construction, Roofing, Water and Wastewater Facilities, Steel Sheet Pile Wall, Water/Wastewater Infrastructure, Stormwater Improvements, Signage, Street/Road Materials The work for which bids are asked includes the following: The City of Fond du Lac, Wisconsin is requesting qualified and responsive bids for multiple prime contracts to construct storm water lift station and utility upgrades. Lincoln Avenue Storm Water Lift Station Upgrade - Contract A Lift Station: The work for which bids are requested shall include complete construction of a Storm water Lift Station and demolition of the existing lift station(s). The project includes: project administration, private property pre- and post-construction surveys, construction perimeter fencing, erosion control, site grading, memorial relocation, dewatering, yard piping, utility services upgrades, private electrical service upgrades, existing flood wall protection, permeable pavers, fencing, restoration, etc. The lift station is a insulated cavity wall masonry block and brick building constructed over a sheet pile construct wet well that includes sheet pile and heavy steel framing, helical piles, dewatering, welding high performance coatings, cathodic protection, electrical, plumbing, HVAC, process mechanical, instrumentation and control, and SCADA enhancements. The lift station will contain a custom owner furnished contractor install (3) vertical axial flow propeller pump(s), Electrical Power Gear, and standby diesel engine generator set with automatic transfer switch. Work under this contract includes demolition of the existing Lincoln Ave Lift station and Thomas Street Lift Station. Bidders will be required to coordinate with multiple owner agents, owner finished equipment supplier, other contractors, and A/E. The anticipated Contract A will be substantial completion date is June 14, 2025 and final completion date is August 15, 2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. If after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents