Last Updated | 04/08/2023 09:31 PM |
Project Title | Lincoln Avenue Storm Water Lift Station Upgrade - Contract A |
Physical Address | View project details and contacts |
City, State (County) | Fond du Lac, WI 54935 (Fond du Lac County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $7,319,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sewer Inspection/Rehabilitation, Sewer Pump Station, Sewer Force Main, Plumbing, Street/Road Asphalt Resurfacing and Milling, Sawcutting/Sidewalk/Pavement, Street/Road Asphalt Milling, Sewer and Water Construction, Roofing, Water and Wastewater Facilities, Steel Sheet Pile Wall, Water/Wastewater Infrastructure, Stormwater Improvements, Signage, Street/Road Materials The work for which bids are asked includes the following: The City of Fond du Lac, Wisconsin is requesting qualified and responsive bids for multiple prime contracts to construct storm water lift station and utility upgrades. Lincoln Avenue Storm Water Lift Station Upgrade - Contract A Lift Station: The work for which bids are requested shall include complete construction of a Storm water Lift Station and demolition of the existing lift station(s). The project includes: project administration, private property pre- and post-construction surveys, construction perimeter fencing, erosion control, site grading, memorial relocation, dewatering, yard piping, utility services upgrades, private electrical service upgrades, existing flood wall protection, permeable pavers, fencing, restoration, etc. The lift station is a insulated cavity wall masonry block and brick building constructed over a sheet pile construct wet well that includes sheet pile and heavy steel framing, helical piles, dewatering, welding high performance coatings, cathodic protection, electrical, plumbing, HVAC, process mechanical, instrumentation and control, and SCADA enhancements. The lift station will contain a custom owner furnished contractor install (3) vertical axial flow propeller pump(s), Electrical Power Gear, and standby diesel engine generator set with automatic transfer switch. Work under this contract includes demolition of the existing Lincoln Ave Lift station and Thomas Street Lift Station. Bidders will be required to coordinate with multiple owner agents, owner finished equipment supplier, other contractors, and A/E. The anticipated Contract A will be substantial completion date is June 14, 2025 and final completion date is August 15, 2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. If after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |