Similar Projects
Walthall Schools Renovation Projects
Renovation
Conception
Tylertown, MS

Walthall Schools Renovation Projects
Renovation
Conception
Tylertown, MS

Forest County Agricultural High School Addition & Renovation Esser 3 Project
Renovation, Addition
Design
Brooklyn, MS 39425

Repairs And Renovations: Coahoma County School District Lyon, Jonestown, Friars Point Elementary Schools
Renovation
Design
$6,129,000 CJ est. value
Clarksdale, MS 38614

ESSER III ARP Funds-2021 - REBID District Wide Restroom Improvements
Renovation
Bidding
$40,000 CJ est. value
Louisville, MS 39339

ESSER III ARP Funds-2021 - REBID District Wide Restroom Improvements
Renovation
Bidding
$40,000 CJ est. value
Louisville, MS 39339

Chickasaw County School District, ESSER II HVAC
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Houlka, MS 38850

Chickasaw County School District, ESSER II HVAC
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Houlka, MS 38850

George County School District Hurricane Zeta Repairs
Renovation
Post-Bid
Lucedale, MS

High School Building Improvements Phase I
Renovation
Post-Bid
Raymond, Utica, MS 39154

Bailey Apac Middle School Renovations
Renovation
Results
Jackson, MS 39202

Sykes Elementary School Renovations
Renovation
Results
Jackson, MS 39212

Carver Middle School Gymnasium and Classroom Addition
Addition
Construction
Raymond, MS 39154

New Construction and Renovation for the Brookhaven School District
New Construction, Renovation, Addition - 6,399 SF
Construction
$4,000,000 to $5,000,000 est. value
Brookhaven, MS 39601

Regents School Of Oxford
New Construction
Pending Verification
Oxford, MS

Last Updated 08/16/2022 04:35 PM
Project Title

George County School District Interior Build-Out for New Central Office

Physical Address View project details and contacts
City, State (County) Lucedale, MS 39452   (George County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals submitted in hard copy shall be submitted in duplicate only upon the blank proposal forms provided with the specifications and must be accompanied by Proposal Security in the form of Certified Check or acceptable Bid Bond in the amount equal to at least five percent (5%) of the Base Bid. Proposals submitted electronically shall be completed upon the blank proposal form provided with the specifications, and uploaded in .PDF format as directed by the Electronic Bidding System. Proposal Security shall also be uploaded in .PDF format to accompany bids submitted electronically. If an electronic bid is submitted, an original hard copy of all Proposal Documents, including Proposal Security, shall be provided to the Architect within three (3) business days after bid receipt, if requested. In either case, such security to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal, execute contract and post Performance Bond in the form and amount within the time specified. The Bid Bond, if used, shall be payable to the Owner. Bids on the Project must be received on or before the period scheduled for the Project and no bid withdrawn after the scheduled closing time for the Project for a period of sixty (60) days. All bids submitted in excess of $50,000.00 by a Prime or Subcontractor to do any erection, building, construction, repair, maintenance, or related work must comply with the Mississippi Contractors Act of 1985, by securing a Certificate of Responsibility from the State Board of Contractors. Each bid, exceeding $5,000.00, must be accompanied by the Bidder's certified check or a bid bond, duly executed by the Bidder as principal and having surety thereon, a surety company approved by the Owner and signed by an agent, regularly commissioned and licensed to transact business in Mississippi, in the amount of five percent of the bid. All bid bonds must be accompanied by the appropriate Power of Attorney. No Power of Attorney is necessary with a certified check. The Owner reserves the right to reject any and all bids on any or all projects and to waive informalities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents