Similar Projects
Token Creek Park Road Repave
Infrastructure
Bidding
Deforest, WI 53532

MSN International Lane Rehabilitation
Infrastructure
Bidding
Madison, WI

Culverts
Term Contract
Post-Bid
WI

Concrete Culverts
Post-Bid
WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

2022 Crackfilling Maintenance
Infrastructure
Bidding
Middleton, WI

Erosion Control Devices
Term Contract
Post-Bid
WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Entrance Improvements
Infrastructure
Bidding
Madison, WI 53704

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

2022 Road Maintenance
Infrastructure
Bidding
Middleton, WI

Road Work
Post-Bid
Verona, WI

Madison - Cambridge, Whitney Way to IH 39/90
Results
Cambridge, Madison, WI 53558

Last Updated 03/11/2022 08:49 AM
Project Title

2022 Road Rehabilitation

Physical Address View project details and contacts
City, State (County) Fitchburg, WI 53593   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of pulverizing the existing pavement on these streets, undercutting areas of poor subgrade, repaving the mainline road, and restoration of driveway aprons and shoulders to match the new road profile. The work for a portion of Ox Trail Way also consists of tree and brush removal, enhancing the right-of-way drainage swales, removing and installing cross culverts, removing and installing driveway culverts, asphalt curb, asphalt flumes, refurbishing riprap and rock gabions, erosion control, and restoration of the work area. The project areas included in the base bid are the full lengths of Almor Drive, Pamela Circle, and Ox Trail Way (from Swoboda Road to Richie Road). An Alternate bid for work on Westman Court is also requested. The overall rehabilitation work (base + alternate) includes the following approximate quantities: 18,750 SY asphalt pulverization, 3,200 tons of hot mix asphalt, removal and replacement of concrete and asphalt driveway aprons, installation of 14,500 lineal feet of gravel shoulders, and restoration of the work area and other miscellaneous items in conformance with the Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents