Similar Projects
Last Updated | 03/11/2022 08:49 AM |
Project Title | 2022 Road Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Fitchburg, WI 53593 (Dane County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the work consists of pulverizing the existing pavement on these streets, undercutting areas of poor subgrade, repaving the mainline road, and restoration of driveway aprons and shoulders to match the new road profile. The work for a portion of Ox Trail Way also consists of tree and brush removal, enhancing the right-of-way drainage swales, removing and installing cross culverts, removing and installing driveway culverts, asphalt curb, asphalt flumes, refurbishing riprap and rock gabions, erosion control, and restoration of the work area. The project areas included in the base bid are the full lengths of Almor Drive, Pamela Circle, and Ox Trail Way (from Swoboda Road to Richie Road). An Alternate bid for work on Westman Court is also requested. The overall rehabilitation work (base + alternate) includes the following approximate quantities: 18,750 SY asphalt pulverization, 3,200 tons of hot mix asphalt, removal and replacement of concrete and asphalt driveway aprons, installation of 14,500 lineal feet of gravel shoulders, and restoration of the work area and other miscellaneous items in conformance with the Contract Documents. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |