Similar Projects
Raymond Drive Basin Rehabilitation / Haverford Township
Infrastructure
Bidding
$400,000 CJ est. value
Haverford Township, PA 19083

Cured-in-Place Pipe Repair
Infrastructure
Bidding
$400,000 CJ est. value
Exton, PA 19341

Erie High School - Elkay LZO8WSLK - Wall Mount Bottle Filling Station - Installation
Alteration
Post-Bid
Erie, PA 16508

SCI Huntingdon - Replace Condensate
Alteration
Post-Bid
$1,000,000 to $2,000,000 est. value
Huntingdon, PA 16654

Welded Steel Water Storage Tank Maintenance Contract
Term Contract
Results
Less than $35,000 est. value
Washington Crossing, PA 18977

Well Pump/Piping Install and Treatment System Upgrade - Plumbing
Results
$28,365 est. value
Woodward, PA 16882

Pymatuning State Park - Rehabilitate State Park Campground Facilities - Plumbing Construction
Alteration
Post-Bid
Less than $100,000 est. value
Linesville, PA 16424

Municipal Building Renovations - Plumbing Construction
Alteration
Results
Pittsburgh, PA 15227

New Water Treatment Facility Project - Plumbing Work
Alteration
Post-Bid
Claysburg, PA

Alterations and Addition Hampton High School - Plumbing Construction
Alteration
Results
Allison Park, PA 15101

Improvements for the Kennett High School Annex - Plumbing Construction
Alteration
Post-Bid
Kennett Square, PA 19348

High School Athletic Improvements - Plumbing Construction
Alteration
Results
Claysburg, PA 16625

Basin Faucet Replacement at Schmid Towers Apartments
Alteration
Post-Bid
Erie, PA 16501

Fall 2021/Spring 2022 Halderman Field - Plumbing Construction
Alteration
Results
Springfield, PA

Renovation of Existing Restrooms - Plumbing Construction
Alteration
Post-Bid
Oakdale, PA 15071

Last Updated 05/30/2023 03:07 PM
Project Title

Lower Little Conestoga Interceptor Rehabilitation Project - Phase 4

Physical Address View project details and contacts
City, State (County) Lancaster, PA 17602   (Lancaster County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,465,050 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CLARIFICATION DEADLINE 4/24/2023 12:00 PM Michael A. Sulpizio, PE, Project Manager RK&K 3501 Concord Road, Suite 130, York, PA 17402 717.840.3603 The SCOPE OF WORK to be performed under this contract consists of the furnishing of all material and the construction, complete in place, for the Lower Little Conestoga Interceptor Rehabilitation Project - Phase 4 including but not limited to: pipe rehabilitation, CCTV inspection, sewer cleaning, CIPP lining, manhole/structure rehabilitation lining, and all general requirements, appurtenances and incidental items of work as shown on the Drawings, specified in the Specifications or as directed by the Engineer. Bidding Documents may be examined without charge at the office of the Authority at the address shown above. After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders. Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a government agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids. Each Bid must be accompanied by Bid security in the form of a certified check, bank check, or Bid bond (in the required form) for ten percent of the Bid total in the same fashion as all other submittals that are made with the Bid. The lowest responsible bidder shall submit the actual Bid security to the Authority within three (3) business days after bid opening. The LANCASTER AREA SEWER AUTHORITY hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, mistakes, defects or irregularities in any Bid. $4.5 Million to $5.5 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Completion- 240Calendar Days

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents