Last Updated | 02/14/2024 09:38 AM |
Project Title | 2023 SD DOT Airport Pavement Rehabilitation Project |
Physical Address | View project details and contacts |
City, State (County) | Pierre, SD 57501 (Hughes County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $877,632 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Approximately 43,900 lbs of Route and Seal Cracks, 27,200 lbs of Overbanding, 244,450 SqYd of Emulsified Seal Coat, 10,000 Ft of Crack Leveling, Pavement Markings, and various other items of related construction Each bid must be accompanied by a certified check, cashier's check or draft in the amount of five percent (5%) of the total bid, and drawn on a solvent State or National Bank, or a ten percent (10%) Bid Bond issued by a surety authorized to do business in the State of South Dakota and payable to the South Dakota Department of Transportation. Separate Payment and Performance Bonds guaranteeing faithful performance of the Contract and payment of all labor, materials, rentals, etc., will be required for an amount equal to one hundred percent (100%) of the amount of the Contract. All bonds must be issued or co-signed by a licensed resident agent of South Dakota. Commencement and Completion: The Engineer will set the beginning date in a written "Notice to Proceed with Construction". The Contractor shall begin the work within ten (10) days of the date set forth in the written "Notice to Proceed" and shall complete the work within the number of calendar days, working days, or completion date or dates as shown in the Specifications. Award of Contract: The right is reserved, as the interest of the SD DOT Office of Air, Rail, and Transit, may require, to reject any and all bids, to waive informality in bids received, and to accept or reject any items of any bid, unless such bid is qualified by specific limitation. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |