Similar Projects
Kingsley Place
New Construction, Infrastructure - 68,871 SF
Conception
$200,000,000 CJ est. value
Spring Hill, TN 37174

New High School - Maury County School District
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Columbia, TN 38401

Gerber Collision / Spring Hill
Addition, Infrastructure - 2,916 SF
Design
$800,000 CJ est. value
Spring Hill, TN 37174

Lasea Road Townhomes
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Columbia, TN 38401

SR 166 (North Main Street) Downtown Revitalization - Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
Mount Pleasant, TN 38474

RFQ Construction Manager - Wastewater Treatment Plant Expansion
Addition, Demolition, Infrastructure
Post-Bid
$65,000,000 CJ est. value
Columbia, TN 38401

RFQ Contractor - Spring Hill Police Headquarters
New Construction, Infrastructure - 62,050 SF
Post-Bid
$10,000,000 CJ est. value
Spring Hill, TN 37174

Wilkes Lane Elementary School
New Construction - 121,089 SF
Results
Spring Hill, TN

Runway Safety Area (RSA) Improvements and Runway Rehabilitation
Infrastructure
Results
$5,717,411 CJ est. value
Mount Pleasant, TN 38474

Dutch Bros Coffee / Columbia
New Construction, Infrastructure - 950 SF
Construction
$285,000 CJ est. value
Columbia, TN 38401

The Highlands Phases 8, 9 & 10
New Construction, Alteration
Pending Verification
$71,000,000 est. value
Columbia, TN 38401

FlexMet Manufacturing Facility
New Construction, Infrastructure - 51,000 SF
Pending Verification
$27,400,000 CJ est. value
Spring Hill, TN 37174

Spring Hill Crossings
New Construction, Infrastructure - 355,200 SF
Conception
$190,000,000 CJ est. value
Spring Hill, TN 37174

Silver Springs Subdivision
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Columbia, TN 38401

Ultium Substation, Substation Construction
New Construction, Infrastructure
Post-Bid
$496,000 CJ est. value
Spring Hill, TN 37174

Last Updated 08/17/2023 09:42 AM
Project Title

Primrose School Expansion

Physical Address View project details and contacts
City, State (County) Spring Hill, TN 37174   (Maury County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: demolition, site work and addition to a 4,654-square-foot educational facility. As of July 31, 2023, the project is out for bids. A general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released.

Details

4,654 SF, 13.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents