Similar Projects
Last Updated | 04/19/2019 07:29 AM |
Project Title | Scheduled and Emergency Guardrail and Fence Repairs and Improvements at Various Locations |
Physical Address | View project details and contacts |
City, State (County) | (Essex, Middlesex Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $914,469 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "373.000","Hr","Laborer","100.002" "10.000","Cy","Unclassified Excavation","120.1" "10.000","Cy","Concrete Excavation","127." "7.000","Cy","Class b Rock Excavation","144." "31.000","Cy","Gravel Borrow - Type c","151.01" "9.000","Ton","Disposal Of Treated Wood Products","184.1" "20.000","Ea","Guardrail Post - Modified Installation","602.3" "25.000","Ea","w Beam Highway Guard Panel - Curved","604.03" "1246.000","Ft","Steel w Beam Highway Guard (Single Faced)","620.1" "4180.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "407.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "140.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "145.000","Ft","Guardrail - Curved, Tl-3 (Single Faced)","620.33" "80.000","Ft","Steel w Beam Highway Guard (Double Faced)","621.1" "260.000","Ft","Guardrail, Tl-2 (Double Faced)","621.12" "136.000","Ft","Guardrail, Tl-3 (Double Faced)","621.13" "90.000","Ft","Steel w Beam Highway Guard - Curved (Double Faced)","621.3" "274.000","Ft","Guardrail - Curved, Tl-2 (Double Faced)","621.32" "296.000","Ft","Guardrail - Curved, Tl-3 (Double Faced)","621.33" "209.000","Ft","Steel Thrie Beam Highway Guard (Single Faced)","623.1" "85.000","Ft","Steel Thrie Beam Highway Guard (Double Faced)","624.1" "60.000","Ft","Steel Thrie Beam Highway Guard - Curved (Double Faced)","624.3" "6.000","Ea","Trailing Anchorage","627.1" "4.000","Ea","Steel w Beam Terminal Section (Single Faced)","627.11" "4.000","Ea","Steel w Beam Terminal Section (Double Faced)","627.2" "4.000","Ea","Steel Thrie Beam Terminal Section (Single Faced)","627.3" "4.000","Ea","Steel Thrie Beam Terminal Section (Double Faced )","627.4" "4.000","Ea","Steel Highway Guard Transition Beam","627.6" "3.000","Ea","Guardrail End Treatment, Tl-2 (Double Faced)","627.72" "3.000","Ea","Guardrail End Treatment, Tl-3 (Double Faced)","627.73" "4.000","Ea","Steel Beam Highway Guard Tangent End Treatment","627.8" "3.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "3.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "4.000","Ea","Steel Beam Highway Guard Flared End Treatment","627.9" "3.000","Ea","Guardrail Flared End Treatment, Tl-2","627.92" "3.000","Ea","Guardrail Flared End Treatment, Tl-3","627.93" "4.000","Ea","Bridge Rail To Highway Guard Rail Transition","628.2" "3.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "3.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "2.000","Ea","Transition To Rigid Barrier (Double Faced)","628.23" "3.000","Ea","Transition To Bridge Rail","628.24" "3.000","Ea","Transition To Thrie Beam","628.25" "4.000","Ea","Impact Attenuator For Median, Capable Of Redirection","628.34" "4.000","Ea","Thrie Bullnose System","628.7" "201.000","Ft","Highway Guard Removed And Reset","630." "1452.000","Ft","Highway Guard Removed And Discarded","630.2" "265.000","Ea","Guardrail Post - Steel","632." "21.000","Ea","Guardrail Post - Wood","632.1" "266.000","Ea","Individual Post Realigned","632.11" "30.000","Ea","Guardrail Offset Block - w Beam","633." "51.000","Ea","Guardrail Offset Block - Thrie Beam","633.1" "337.000","Ea","w Beam Guard Panel","634." "137.000","Ea","Thrie Beam Guard Panel","634.1" "450.000","Ft","Protective Screen (Chain Link)","638.1" "345.000","Ft","36 Inch Snow Fence - 1 Inch Mesh","638.150" "268.000","Ft","36 Inch Snow Fence - 2 Inch Mesh","638.151" "273.000","Ft","48 Inch Snow Fence - 1 Inch Mesh","638.153" "201.000","Ft","48 Inch Snow Fence - 2 Inch Mesh","638.154" "4.000","Ea","Snow Fence At Dry Stand Pipe","638.310" "3.000","Ea","Snow Fence At Large Sign Support Haunch With Cabinets","638.320" "3.000","Ea","Snow Fence At Bridge Expansion Joint","638.330" "3.000","Ea","Snow Fence At Haunch With Gate","638.340" "387.000","Ft","36 Inch Chain Link Fence (Stw) On Concrete Barrier","644.038" "537.000","Ft","48 Inch Chain Link Fence (Stw) On Concrete Barrier","644.049" "1110.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) (Line Post Option)","644.072" "950.000","Ft","48 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.148" "900.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.172" "955.000","Ft","96 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.196" "633.000","Ft","72 Inch Chain Link Fence (Stw) With (Modified Post Option)","645.050" "280.000","Ft","Fence Pipe Top Rail - Galvanized","646.072" "279.000","Ft","Fence Pipe Top Rail - Vinyl Coated","646.073" "890.000","Ft","3 Strand Galvanized Barbed Wire","646.998" "169.000","Ft","72 Inch Chain Link Gate With Gate Posts","650.072" "169.000","Ft","48 Inch Chain Link Gate With Gate Posts Vinyl Coated","650.148" "171.000","Ft","72 Inch Chain Link Gate With Gate Posts Vinyl Coated","650.172" "175.000","Ft","96 Inch Chain Link Gate With Gate Posts Vinyl Coated","650.196" "162.000","Ea","72 Inch Chain Link Fence End Post","652.072" "39.000","Ea","72 Inch Chain Link Fence Corner Or Intermediate Brace Post","653.072" "592.000","Ft","72 Inch Chain Link Fence Fabric","654.072" "199.000","Ft","96 Inch Wooden Stockade Fence (Line Post Option)","658.01" "57.000","Ft","48 Inch Wooden Shadowbox Fence","659.048" "57.000","Ft","72 Inch Wooden Shadowbox Fence","659.072" "57.000","Ft","96 Inch Wooden Shadowbox Fence","659.096" "57.000","Ft","120 Inch Wooden Shadowbox Fence","659.120" "1717.000","Ft","Chain Link Fence Removed And Disposed","665.200" "371.000","Ft","Chain Link Fence Removed And Reset","666." "184.000","Ft","Sedimentation Fence","697." "16.000","Ea","Emergency Response","748.1" "90.000","Ea","Bales Of Hay For Erosion Control","767.8" "186.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "75.000","Ea","Delineation For Guard Rail Termini","833.7" "83.000","Hr","Roadway Flagger","850.41" "104.000","Day","Traffic Cones For Traffic Management","851.1" "346.000","Sf","Safety Signing For Traffic Management","852." "103.000","Day","Truck Mounted Attenuator","853.403" "47.000","Day","Temporary Illumination For Work Zone","853.8" "20.000","Day","Temporary Portable Rumble Strips","854.60" "153.000","Day","Arrow Board","856." "357.000","Day","Reflectorized Drum","859." "47.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "5.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |