Similar Projects
Bridge Replacement
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

Bridge Replacement
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

11th Street over Corby Parkway Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO 64504

Clay County Bridge Replacement
New Construction
Post-Bid
Liberty, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Buckner Tarsney Road Bridge Replacement North of Ryan Road
Results
Independence, MO

Bridge Replacement
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

King Hill Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO

Highway N Bridge Repairs at Dardenne Creek Repairs
Results
Cottleville, MO

2 Bridge Replacements
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
MO

22nd Street Over Corby Parkway Bridge Replacement
New Construction, Infrastructure
Post-Bid
Saint Joseph, MO 64504

Washington County Bridge Replacement
Results
Potosi, MO

14 Bridge Rehabilitations and 11 Bridge Rehabilitations
New Construction, Infrastructure
Bidding
$25,000,000 to $50,000,000 est. value
MO

Gene Field Road over North East Parkway Bridge
New Construction
Post-Bid
Saint Joseph, MO 64504

2021 Bridge Deck Sealing
New Construction
Results
Wildwood, MO

Last Updated 02/18/2022 10:03 AM
Project Title

Denmark Road Phase 3 Bridge

Physical Address View project details and contacts
City, State (County) Union, MO 63084   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes the removal of the low water crossing on Denmark Road at Birch Creek and replacement with a single-span prestressed concrete girder bridge. The work also includes construction of embankments for the approach roadways, base rock, asphalt pavement, pavement striping, traffic control and other incidental items.

Details

Bridge, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents