Similar Projects
Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Combined Sewer Overflow Control Project Year Two
Infrastructure
Bidding
$500,000 CJ est. value
Peoria, IL 61603

Sealcoating
Infrastructure
Bidding
$300,000 CJ est. value
Millbrook Township, IL 61451

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2022 Brimfield Athletic Fields
Infrastructure, Alteration
Post-Bid
$500,000 est. value
Brimfield, IL 61517

Princeville Administration Storage Building
New Construction - 1,278 SF
Results
Less than $200,000 est. value
Princeville, IL 61559

Peoria Simantel Property - Park Area Development
New Construction, Infrastructure
Results
$844,000 est. value
Peoria, IL 61603

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

PCC Pavement Reconstruction, PCC Shoulders, Curb and Gutter, Storm Sewer Replacement, Traffic Signal Installation and Lighting
Infrastructure
Bidding
$200,000 CJ est. value
Medina Township, IL 61523

2022 Pavement Maintenance Program
Infrastructure
Post-Bid
$3,841,000 CJ est. value
Mossville, IL 61552

Springdale Creek Streambank Stabilization
Infrastructure
Results
$406,000 est. value
Peoria, IL 61640

Rehabilitate the Bridge Carrying CH 23R
Infrastructure
Bidding
$700,000 CJ est. value
Hanna City, IL 61536

Peoria Public Schools - Harrison Community Learning Center Sidewalk Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Peoria, IL 61605

Culvert Replacement for East Branch of Dry Run Creek at West Merle Lane
Infrastructure
Results
$1,261,829 CJ est. value
Peoria, IL 61604

Last Updated 12/29/2022 03:04 PM
Project Title

Elmwood Community Unit School District 322, CTE Addition

Physical Address View project details and contacts
City, State (County) Elmwood, IL 61529   (Peoria County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A pre-engineered wood pole building addition of approximately 3,000 sq. ft. including a masonry fire wall, MEP systems including building exhaust, electrical panels, and an automatic sprinkler system in addition to standard MEP building systems. Project Completion date(s): 1. Substantial Completion: Friday, July 21, 2023. 2. Final Completion: Friday, August 4, 2023. Bidders shall provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount. Refer to other bidding requirements described in Document 00 2113 - Instructions to Bidders. Submit your offer on the Bid Form provided. Bidders may supplement this form as appropriate. Bids shall not be withdrawn for Sixty (60) calendar days from the date of receipt of Bids. The Owner reserves the right to accept or reject any or all offers and to waive informalities in the bidding. Successful bidders shall conform to the current rules and regulations of the Fair Employment Practices Commission. Attention is called to the provisions of Equal Employment Opportunity. Contractor shall not pay less than the prevailing rates of wages as determined by the Illinois Department of Labor to all laborers, workers and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Prevailing Wage Act (820 ILCS 130/1-12).

Details

3,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents