Similar Projects
WIS 178, Olson Drive Intersection - Wisconsin Department of Transportation
Infrastructure
Conception
$1,400,000 CJ est. value
Chippewa Falls, WI 54729

WIS 178, Olson Drive Intersection - Wisconsin Department of Transportation
Infrastructure
Conception
$1,400,000 CJ est. value
Chippewa Falls, WI 54729

Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Design
$4,000,000 CJ est. value
Cadott, WI 54727

Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Design
$4,000,000 CJ est. value
Cadott, WI 54727

Transit Transfer Center Bid Package No. 3
Renovation, Infrastructure
Post-Bid
Eau Claire, WI

Transit Transfer Center Bid Package No. 3
Renovation, Infrastructure
Post-Bid
Eau Claire, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Baribeau and Johnson Road Improvements
Infrastructure
Results
Cornell, WI 54732

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

Blacktop
Infrastructure
Post-Bid
Holcombe, WI

Well No. 5 Pump House and Site Improvements
Infrastructure
Results
Lake Hallie, WI

Parking Lot Repaving
Infrastructure
Construction
$219,500 CJ est. value
Chippewa Falls, WI 54729

Last Updated 03/16/2023 05:32 PM
Project Title

NWC Security System Upgrade - State of Wisconsin - Department of Health Services

Physical Address View project details and contacts
City, State (County) Chippewa Falls, WI 54729   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $560,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 16, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: EALTH SERVICES - NORTHERN WISCONSIN CENTER, CHIPPEWA FALLS This project will install new card access control and security cameras at all campus building entrances at the Northern Wisconsin Center. These upgrades will greatly enhance campus security.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents