Similar Projects
Wellford Academy Rebuild
New Construction
Conception
Wellford, SC 29385

Reidville Elementary School Renovation and Addition
Renovation, Addition
Conception
Reidville, SC 29375

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

Spencer's Trail
New Construction
Design
Anderson, SC

One (1) Delfield Serving Line for Crosswell Elementary School
Renovation
Bidding
$350,000 CJ est. value
Easley, SC 29640

One (1) Delfield Serving Line for Central Elementary School
Renovation
Bidding
$200,000 CJ est. value
Central, SC 29630

A. C. Corcoran Elementary School - Cabinet Replacement Project - Rebid
Renovation
Sub-Bidding
$87,000 CJ est. value
North Charleston, SC 29406

A.C. Corcoran Elementary School Cabinet Replacement
Renovation
Sub-Bidding
North Charleston, SC 29405

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

Harry Byrd Highway Recreation Complex - City of Darlington
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Darlington, SC 29532

Construction of Azalea Fuel Facility
New Construction, Infrastructure
Results
$13,906,000 CJ est. value
North Charleston, SC 29405

North Chester Fire Station Site/Civil Construction
Results
Chester, SC 29706

Bethel Presbyterian Church
New Construction, Renovation, Addition - 16,433 SF
Construction
$698,863 est. value
Clover, SC

Spinx #368 / Charleston
New Construction, Infrastructure - 4,000 SF
Construction
$3,000,000 CJ est. value
Charleston, SC 29401

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Last Updated 02/07/2023 09:06 AM
Project Title

RFQ Construction Management at Risk Services - Lee County Consolidated Elementary School

Physical Address View project details and contacts
City, State (County) Bishopville, SC 29010   (Lee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $42,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 7, 2023, the project has been awarded but not public knowledge at this time. Construction Management at Risk Services Construction Cost Range: $38 - $42 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents