Similar Projects
Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Two Year Contractual Services Contract for Asphalt Repair
Term Contract
Post-Bid
Romulus, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Cart Path Repair Blue and Gold-Golf Course
Results
Riverview, MI

Bundle 3 Rest Areas Ada Eastern Lower Peninsula - Exterior
Post-Bid

North Fishing Site Redevelopment
Results
Belleville, MI 48111

USCG Repair Asphalt Roads, Detroit, MI
Post-Bid
$500,000 to $1,000,000 est. value
Detroit, MI

Installation of Asphalt Walking Track at Jefferson Elementary School Project
Results
Redford, MI 48239

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Replacement of Pavement and Water Mains
Results
$2,250,000 est. value
Allen Park, MI 48101

Pavement Reconstruction on West Jefferson Avenue
Alteration
Post-Bid
Detroit, MI

2021/2022 Sidewalk and Concrete Repair Program Water Main Breaks
Results
Livonia, MI

Joe Louis Greenway- Site Construction 2021
Infrastructure
Post-Bid
Detroit, MI

Conant Street, Detroit-Site Remediation
Results
Hamtramck, MI 48212

DFD Training Lot Renovation
Renovation, Infrastructure
Post-Bid
Detroit, MI 48234

Last Updated 08/11/2022 05:04 PM
Project Title

2022 Sidewalk Replacement Program

Physical Address View project details and contacts
City, State (County) Van Buren Twp, MI 48111   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $290,250 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 11 2022, project was awarded to Rotondo Construction - $290,250.00. The project construction starts by the end of this month and completion is on November 2022. Removal and replacement of sidewalk at spot locations throughout the Van Buren Estates (Haggerty Subdivision) near South West corner of Haggerty and Tyler. General Requirements - Insurance Required - Bidder Prequalification/Preregistration Required - Contractors License Required - Onsite Maintenance Required - Installation Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % Job Location Van Buren Estates (Haggerty Subdivision) Questions are submitted online No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents