Similar Projects
2022 Street Rehabilitation Project Specific Contract Package 9 (Mill and Overlay)
Infrastructure
Bidding
$10,000,000 est. value
San Antonio, TX

2022 Street Rehabilitation Project Specific Contract Package 11
Infrastructure
Bidding
$5,000,000 est. value
San Antonio, TX

Concrete Paving or Repairs
Post-Bid
Live Oak, TX 78233

2020 Street Maintenance Project
Post-Bid
Saint Hedwig, TX 78152

Southern Region Disaster Recovery Support BPA
Results

Repair Stanley Road
Results
$1,000,000 to $5,000,000 est. value
San Antonio, TX 78234

FY 2021 Pavement Preservation Package 1 - Crack Seal Task Order Contract
Post-Bid
$495,000 est. value
San Antonio, TX 78205

Bynum Avenue (West Gerald Avenue to South West Military Drive)
Results
Less than $5,773,331 est. value
San Antonio, TX 78211

Toepperwein Road Improvement
Post-Bid
Converse, TX 78109

2017 Bond Program - Pedestrian Mobility and Streets Task Order Contract Package 8
Results
Less than $4,000,000 est. value
San Antonio, TX 78205

Construction of Johnson Ranch North Unit 9 Public Water, Wastewater, Paving and Drainage Improvements and Johnson Ranch North Unit 9 Private Paving and Grading Improvements
Post-Bid
San Antonio, TX

Asphalt Rejuvenator
Results
Less than $600,000 est. value
San Antonio, TX 78207

Somerset K - Street Phase II Reconstruction
Post-Bid
Somerset, TX 78069

2020 Paving Improvement Projects
Results
San Antonio, TX 78263

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Post-Bid
Olmos Park, TX

Last Updated 10/01/2021 08:34 AM
Project Title

2022 Street Rehabilitation Project Specific Contract Package 8 (Mill and Overlay)

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project construction may include but is not limited to: asphalt milling and overlay, seal coat, base and pavement replacement, cleaning and sealing joints and cracks, curb ramps, concrete curbs, sidewalks, driveways, concrete retaining walls-combination type, speed humps, topsoil, sodding, signage, pavement markings installation, adjusting existing valve boxes and manholes, and any other items required due to the site conditions to accomplish the project scope.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents