Similar Projects
Upgrade HVAC System and Lighting
Alteration
Design
$3,086,485 est. value
Springfield, IL

Chiller Maintenance and Repair State Museum
Term Contract
Post-Bid
Springfield, IL 62706

Insulation Repair Services for Plumbing and Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL

Emerson Building HVAC Replacement Phase I
Renovation
Results
$1,000,000 to $1,500,000 est. value
Springfield, IL 62794

Replace HVAC - Emmerson Building
Results
Less than $1,500,000 est. value
Springfield, IL 62794

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Upgrade HVAC System
Renovation
Results
Less than $2,000,000 est. value
Springfield, IL 62703

Emergency Final Costs - Vandalia Statehouse Chiller Replacement
Post-Bid
Springfield, IL

Renovate Building 2 For Soldier Support - Ventilation
Renovation
Results
Less than $100,000 est. value
Springfield, IL 62702

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Upgrades - Herndon Building
Renovation
Results
Springfield, IL 62756

DAT-Academy-HVAC Repair & Maintenance Services
Term Contract
Post-Bid
Pawnee, Springfield, IL 62712

Update HVAC Controls - Heating
Results
Less than $2,000,000 est. value
Springfield, IL 62702

D1 HVAC Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Springfield, IL

Update HVAC Controls - Temperature Controls
Results
Less than $700,000 est. value
Springfield, IL 62702

Last Updated 01/31/2022 12:56 PM
Project Title

Springfield High School Science Wing HVAC System Improvements

Physical Address View project details and contacts
City, State (County) Springfield, IL 62704   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Generally, the work includes replacing five existing air-to-air heat exchangers with dedicated outside air units. Rebalancing of the airside system and some ductwork modifications are required. New needlepoint bipolar ionization devices will be installed in the existing fan coil units or air handling units serving the individual spaces. Power to the new dedicated outside air units and needlepoint bipolar ionization devices will be extended from the existing power distribution system. Fire alarm devices will be installed in the new DOAS systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents