Similar Projects
Mckinley Storm Sewer Improvements
Infrastructure
Bidding
Warsaw, IN 46582

Oak Avenue Stormwater Improvements
Infrastructure
Bidding
$200,000 to $300,000 est. value
Gary, IN 46403

Alexander Street Storm & Sanitary Sewer Installation
Post-Bid
Bremen, IN 46506

2020 Guaranteed Savings Contract Provider RFQ
Post-Bid
Muncie, IN 47302

Grace Street Storm Sewer Improvement
Results
Less than $565,000 est. value
Highland, IN 46322

8th & Ohio Drainage Improvement
Results
Jeffersonville, IN 47130

Lindley Ditch Stormwater
Post-Bid
Huntington, IN

Southeastway Septic System
Results
$70,000 to $80,000 est. value
Indianapolis, IN 46225

Graham Street Storm Sewer Replacement
Post-Bid
Franklin, IN 46131

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Helmsburg Stormwater Improvements
Post-Bid
Nashville, IN 47448

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

2021 Street Improvements
Post-Bid
Fremont, IN 46737

Michigan and Evans Sewer Replacement
Results
Evansville, IN 47708

CCMG Road Improvements
Post-Bid
Huntingburg, IN 47542

Reported 09/17/2021 12:00 AM
Project Title

Storm Water Improvement Project

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN   (Allen County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project A – Installation of storm pipes through the north/south “Bullet Barrier Mound” utilizing: Option #1 Two, 38"x24", Elliptical RCP Pipes or Option #2 Two, 36” Round RCP Pipes Only one Option can be used. They will also be required to create a “flow path” from the new pipes to the existing 48” CMP pipe that carries water to the detention pond through the east/west north bullet mound shown on sheet “OUT” 7 of 7. Additional work under Project A will be the installation of two new 12” RCP under the entrance drive shown on sheet PP1. All work will include the items shown on various appropriate sheets including but not limited to trash racks, removal of existing pipes, ditch profiling, concrete, erosion control blankets, stone, landscaping, surface remediation of the site, and entrance drive repairs after the work is complete. Project B - Installation of 24”, new storm pipe on the west side of Adams Center Road, running north and south, and repair work where water eroded the adjoining banks. This will include all items shown on the drawings for a completed project. The installation of the pipe will involve the removal of several landscape items. Once the work is complete the owner will remediate this loss of trees and scrubs, understanding that every effort should be made to minimize the loss.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents