Similar Projects
PBSO, Motor Pool - Chiller and Make-up Air Replacement
Term Contract
Bidding
West Palm Beach, FL 33406

WUD SRWRF - Bldg. A, J, & JJ HVAC Replacements
Alteration
Bidding
Boynton Beach, FL 33437

South County Admin - HVAC Replacement
Term Contract
Post-Bid
Delray Beach, FL 33445

EOC - HVAC Controls Upgrade
Term Contract
Post-Bid
West Palm Beach, FL 33415

HVAC Replacement at Vehicle Maintenance Building
Results
FL

Air Conditioning Monthly Maintenance - Annual Contract
Term Contract
Results
Royal Palm Beach, FL 33411

WUD Southern Region Water Reclamation Facility (SRWRF) - Building A, J and JJ HVAC Replacements
Alteration
Bidding
$50,000 est. value
Boynton Beach, FL 33437

WUD SROC Building P, Building O and WTP 3 Building J - HVAC Replacement
Term Contract
Post-Bid
Delray Beach, FL 33446

N041--Air Curtains Remove and Install West Palm Beach Medical Center
Results
Riviera Beach, West Palm Beach, FL 33410

Cooling Towers Cleaning and Maintenance Services
Term Contract, Alteration
Bidding
West Palm Beach, FL 33410

N041--Air Curtains Removal and Install
Post-Bid
West Palm Beach, FL 33410

Chilled Water Treatment Services
Term Contract
Results
Palm Beach, FL

Belle Glade Office Building - HVAC Replacement
Term Contract
Post-Bid
Belle Glade, FL 33430

Town Hall Chiller and BCU Replacement
Results
Less than $325,000 est. value
Jupiter, FL 33458

A/C Maintenance and Repairs, Term Contract
Term Contract
Post-Bid
FL

Last Updated 05/02/2022 10:28 AM
Project Title

Z1da--Bid Build Variable Air Volume Assembly (Air Terminal Units) Replacement

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33410   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor is to provide all labor, tools, material, and equipment necessary to replace 1,184 (Contractor to verify) DDC Variable Air Volume (VAV) assemblies consisting of air terminal units, reheat coils and control valves, all Direct Digital Controls and thermostats associated with the boxes in the Main Hospital. Additionally, the contractor is to provide all labor, tools, material, and equipment necessary to replace 119 (Contractor to verify) DDC Variable Air Volume (VAV) assemblies consisting of air terminal units, reheat coils and control valves, all Direct Digital Controls and thermostats associated with the boxes in the Community Living Center. Refer to the project drawings for additional details.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents