Similar Projects
RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

Miscellaneous Construction - North Street Car way
Infrastructure
Bidding
$600,000 CJ est. value
Lost Creek, WV 26385

Miscellaneous Construction - North Street Car way
Infrastructure
Bidding
$600,000 CJ est. value
Lost Creek, WV 26385

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

NB and SB Rest Areas
Infrastructure
Post-Bid
WV

Curtis Exxon Paving Former UST Site
Results
Clarksburg, WV 26301

WV 131 Road Improvements
Results
WV

Renovations at United Technical Center
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Clarksburg, WV 26301

WV Route 279 Improvement Plans
Alteration
Post-Bid
Bridgeport, WV 26330

Elk Creek East Bridge
New Construction, Infrastructure
Results
WV

West Virginia Department of Environmental Protection Construction and Reclamation
Infrastructure
Bidding
$220,000 CJ est. value
Clarksburg, WV 26301

Wolf Summit-Adamston Road
Infrastructure
Results
WV

RFQ Contractor - Fwaats Hangar 2 Internet Cable and Wifi Install
Renovation, Infrastructure
Bidding
$10,000 CJ est. value
Bridgeport, WV 26330

Anmoore Br O/P
Infrastructure
Results
WV

Last Updated 08/12/2022 09:06 AM
Project Title

Michael Angiulli Memorial Bridge

Physical Address View project details and contacts
City, State (County) Clarksburg, WV 26301   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP5059006D Type of Work : Replace Bridge As of August 12, 2022, the project is in Final Planning status. The funding obligation date for the construction is May 28, 2022. WVDOT - Michael Angiulli Memorial Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents