Similar Projects
MAPS4 - Arena/Related Facilities
Renovation
Conception
$16,095,800 est. value
Oklahoma City, OK

North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

Fusion Storage - Phase 1
New Construction - 63,300 SF
Design
$550,000 est. value
Oklahoma City, OK 73131

Interchange - US 40
Infrastructure
Design
$43,000,000 est. value
Oklahoma City, OK 73195

Wastewater Treatment Plant Improvements
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Tuttle, OK 73089

Grade, Drain, Surface, and Bridge - US-270
Infrastructure
Bidding
$30,000,000 CJ est. value
Seminole, OK 74868

Demolition and Removal of the Old Sheriff's Department
Demolition, Infrastructure
Sub-Bidding
$90,000 CJ est. value
Kingfisher, OK 73750

Purchase and Remove House at 2222 W. 6th Ave
Demolition, Infrastructure
Sub-Bidding
$156,820 CJ est. value
Stillwater, OK 74074

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Site Preparation Services
Term Contract
Post-Bid
Claremore, OK 74017

Drill, Case and Complete Water Well | Lots 1,2,3,4 and S/2N/2 Sec 1-4N-13ECM
Infrastructure
Results
Oklahoma City, OK

CMF Building 16 Warehouse Office Renovations and Expansion
Renovation, Addition
Results
$230,000 est. value
Oklahoma City, OK

Distribution Center - Project Koda
New Construction - 270,000 SF
Construction
$25,500,000 est. value
Tulsa, OK 74116

Integrated Office Building
New Construction - 32,111 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Edmond, OK 73013

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

Last Updated 08/11/2022 04:08 PM
Project Title

Hardy Murphy Coliseum Agricultural Arena Project

Physical Address View project details and contacts
City, State (County) Lone Grove, OK 73443   (Carter County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A project involving the construction of a pre-engineered, metal, open arena, with roof. Bids shall be opened by the City of Ardmore in the Purchasing Department, Room 103, City Hall at 23 South Washington, Ardmore, OK, 73401, at the above stated time for receipt of bids or as soon thereafter as practicable and publicly read aloud and tabulated. Bids shall be made in accordance with the Instructions for Bidders contained in the Contract Documents. All bids timely received shall be considered by the City prior to a Contract being awarded. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and Holidays, before the time set for opening of bids, as well as bids received after the time set for opening of bids, will not be considered and will be returned unopened. The Bidder shall honor the bid prices for a period of sixty (60) days from the time the bids are opened. The City reserves the right to reject any or all bids and the right to waive immaterial defects and irregularities, or award the bid by item/schedule or all/none as it deems to be in the best interest of the City. Bid security in the form of a cashiers check, a certified check, a Surety Bond, or an irrevocable letter of credit containing all required terms, in the amount of five percent (5%) of the Base Bid, shall accompany the sealed Bid of each Bidder. Bid security will be returned to the unsuccessful Bidders. The Bidder shall only use the City s Bid Proposal, bond forms, and affidavits or photocopies thereof. All forms must be signed and all affidavits sworn to and notarized. All bids shall be typewritten or handwritten in ink. Bidder shall submit the bid in a sealed envelope. Each envelope shall bear a legible notation thereon that it is a bid upon the project proposed and the name of the Bidder, and include Bidder s address and telephone number. The Successful Bidder shall deliver the executed Contract and Bonds together with the certificates of insurance, all as required in the Contract Documents, to the City no later than fifteen (15) calendar days following the City s notification of its intent to award the Contract, unless that time is extended by the City. The City may issue addenda as may be necessary in the best interest of the public and the City. Addenda may amend the date and/or time for receipt of bids or any specification, item, document, or requirement in the Contract Documents upon notice to all prospective Bidders who have requested Contract Documents for this project. The Contract will be awarded to the lowest responsible bidder as determined by the Ardmore City Commission.

Details

Stadium, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents