Similar Projects
TRAIL: Coyote Creek Lighting( Under Interstate 280) - City of San Jose
Infrastructure
Conception
Less than $315,000 est. value
San Jose, CA 95154

Signal System Upgrade - Paularino, Fair, Wilson, Anton - City of Costa Mesa
Infrastructure
Conception
$900,000 est. value
Costa Mesa, CA

Downtown Alley Improvements - City of Arcadia
Alteration
Design
$1,600,000 est. value
Arcadia, CA

Install Lighting, Widen Shoulders, Upgrade End Treatments at Bridge Approaches, and Rehabilitate Culverts
Infrastructure
Design
$17,100,000 est. value
Chico, CA 95928

On-Call Lighting Repair 2022 Project
Term Contract
Bidding
$100,000 est. value
Fairfield, CA

Roseville Road RR Crossing - Street Light Installation
Alteration
Bidding
$440,000 est. value
CA

Z1da-- 605-19-410 Upgrade Parking Lot -Lighting and Conduit
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Loma Linda, CA

Traffic Signal and Streetlight Maintenance Services
Infrastructure
Post-Bid
Livermore, CA

Downtown San Mateo Twinkle Light Maintenance
Alteration
Results
San Mateo, CA

Install Solar Pv Powered Lighting System
Infrastructure
Results
$1,960,000 est. value
CA

209th Street ,Brant Avenue,Lamberton Avenue,Maciel Avenue,Selective Roadway - PW1116 - City of Carson
Alteration
Conception
$1,000,000 est. value
Carson, CA

Inspection and Maintenance of Dumbarton Rail Bridge Navigation Lights
Infrastructure
Bidding
Woodside, CA 94062

Type B Street Light Poles
Infrastructure
Post-Bid
Sacramento, CA

Pedestrian Path Improvements on Rosamond Boulevard and 20th Street West
Infrastructure, Alteration
Results
$1,405,387 est. value
Rosamond, CA 93560

Roseville Road Rail Road Crossing Streetlight Project
Infrastructure
Bidding
$440,000 est. value
Citrus Heights, CA 95621

Reported 06/27/2022 09:05 AM
Project Title

Traffic Signal Upgrades (M312.41 and M312.46) - PW1657 - City of Carson

Physical Address View project details and contacts
City, State (County) Carson, CA   (Los Angeles County)
Category(s) Outdoor Lighting
Sub-Category(s) Roadway Lighting
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $4,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a road / highway in Carson, California. Conceptual plans call for site work for a road / highway. Traffic Signal Upgrades at 7 Intersections - Figueroa St at 228th St, Figueroa St at 234th St, Figueroa St at 223rd St, Figueroa St at Victoria St/190th St, Main St at 220th St, Main St at Albertoni St, and Main St at Victoria Street Pending MTA's funding agreement for construction. This Project is Included in the City of Carson's FY 2022 - 2023 Capital Improvement Plan (CIP). As of June 24, 2022, information regarding a design team and a general contractor is not available. Funding is anticipated from FY 2022 to FY 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents