Similar Projects
Concrete Work at Gum Springs Park
Alteration
Bidding
GA

Annual Concrete Pipe
Term Contract
Bidding
GA

Concrete Maintenance
Post-Bid
Covington, GA

Demand Services for On-Call Concrete Contractors Annual Contract
Term Contract
Post-Bid
Gainesville, GA 30501

T32-D7-PCC-Glare Screen I75-98321
Results

T32-D7-PCC-Glare Screen I75-98321
Results

Cumming City Center Parking Deck Concrete Building K
Post-Bid
Cumming, GA

T32-D2-PCC-SR402-Greene County-99403
Results
GA

Concrete
Term Contract
Post-Bid
Ellijay, GA 30540

Xpress West Douglas and Panola Park and Ride Lot Granite and Concrete Repair Work
Results
Stockbridge, GA 30281

Concrete Pad
Post-Bid
Savannah, GA

Consession Building Concrete Apron Pour
Results
Munnerlyn, GA 30830

Concrete Materials
Term Contract
Post-Bid
GA

2020 Concrete Repair Project 1
Results
Johns Creek, GA 30097

Concrete Mix - Annual Contract
Post-Bid
Warner Robins, GA

Last Updated 08/30/2021 08:35 AM
Project Title

Concrete Pads and Sidewalks for Marta Shelters

Physical Address View project details and contacts
City, State (County) Tucker, GA   (DeKalb County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Tucker (City), requests that interested parties submit formal sealed bids/proposals to construct concrete pads in five (5) locations, and sidewalk improvements in two (2) locations. MARTA shelters, or City benches, are to be installed at each of the five (5) pad locations. All MARTA shelters are to be installed by MARTA, and therefore should not be included in this bid. Some pads may require the relocation of existing signs and trash receptacles. The location of the concrete pads and sidewalk improvements can be found on the location map provided in Exhibit E. All concrete pads are to be constructed per the following specifications. GENERAL CONDITIONS The contractor shall execute the work according to and meet the requirements of the following: Georgia Department of Transportation (GDOT) Specifications, Standards, and Details; Metro Atlanta Rapid Transit Authority (MARTA) Specifications, Standards, and Details; The Contract Documents including but not limited to the scope of work, details, and specifications; City of Tucker ordinances and regulations; OSHA standards and guidelines; Any other applicable codes, laws and regulations including but not limited to Section 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990. The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work. This is a unit price bid. Payment will be made based on actual work completed. The contractor is responsible for inspecting the jobsite prior to submitting a bid. No change orders will be issued for differing site conditions. Materials must come from GDOT approved sources. The contractor will be required to submit in writing a list of proposed sources of materials. When required, representative samples will be taken for examination and testing prior to approval. The materials used in the work shall meet all quality requirements of the contract. Materials will not be considered as finally accepted until all tests, including any to be taken from the finished work have been completed and evaluated. Standard Specification 106 – Control of Materials will be used as a guide. All materials will be tested according to the GDOT Sampling, Testing, and Inspection Manual by an approved consultant/lab hired by the City.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents