Similar Projects
Metal Registers, Grilles and Diffusers
Bidding
Phoenix, AZ 85016

Ishikawa Elementary Cooling Tower Replacements
Bidding
Mesa, AZ 85213

BCESD - HVAC Heat Pump Replacement Unit
Post-Bid
Bullhead City, AZ 86442

HVAC Maintenance and Repair Services
Post-Bid
Phoenix, AZ 85003

VA Tucson Replace AHUs for Critical Care and Sterile Processing
Results
$2,000,000 to $5,000,000 est. value
Tucson, AZ 85723

HVAC Support Maintenance for Nodes
Results
Fort Huachuca, AZ 85613

District Wide Outside Kitchen Grease Trap Pumping
Term Contract
Bidding
$10,000 to $12,000 est. value
Mesa, AZ

DEMA SBAH Bldg L4535 Chiller Replacement (M20-0012) Single
Post-Bid
Marana, AZ

The Purpose of this Solicitation is to Acquire A/C
Results
Parker, AZ 85344

Computer Room Air Conditioner Maintenance and Service
Term Contract, Alteration
Bidding
Phoenix, AZ 85007

River Valley HVAC Replacements
Post-Bid
Bullhead City, AZ 86442

Air Handler Units (AHUs) Replacement
Results
Phoenix, AZ

Chiller Replacement at Connolly Middle School
Post-Bid
Tempe, AZ 85282

Western Region - HVAC Services
Results
Phoenix, AZ

2020 Heating, Ventilation, and Air Conditioning Services
Post-Bid
Fort Defiance, AZ 86504

Last Updated 05/20/2021 04:32 PM
Project Title

Replacement of Existing Heating and Cooling System at Superior Courthouse

Physical Address View project details and contacts
City, State (County) Bisbee, AZ 85603   (Cochise County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the Existing Heating and Cooling Systems at the Cochise County Courthouse located at 100 Quality Hill, Bisbee, AZ 85603 Task 1- Demolition, removal, and disposal of all existing AJAX boiler system equipment and piping throughout the basement, first, and second floors of the courthouse. Task 2 – Demolition, removal and disposal of the chiller and all of its accompanying attachments and piping Task 3- Removal and disposal of all existing fan coils. Task 4- Systematic installation of a Daikin VRF system. Task 5- Remove all debris from the project site throughout the duration of the project Task 6- Provide the County with Engineered mechanical and electrical drawings of theplanned VRV/VRF layout Task 7- Provide the County with a complete set of as build drawings when the system is complete.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents