Similar Projects
Street Enhancements: NW 10th Street from Rockwell Avenue to Council Road - City of Oklahoma City
Alteration
Conception
Oklahoma City, OK 73195

Deep Fork Greenway Trail - Northeast Oklahoma City (Ward 7)
Infrastructure
Conception
Oklahoma City, OK

Contractor - CHIC 313113, Pavement Improvements
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Sulphur, OK 73086

Interchange - US 40
Infrastructure
Design
$43,000,000 est. value
Oklahoma City, OK 73195

Kickapoo Street Sidewalk Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Flow Equalization Basin Joint and Crack Repair
Infrastructure
Bidding
$1,000,000 est. value
Tulsa, OK

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt)
Post-Bid
OK

Grade, Drain, Surface and Bridge
Results
Fort Cobb, OK

Resurface (Asphalt)
Results
Wagoner, OK

BSSC Resurfacing of South Sooner - South Sooner Road from South East 89th Street to I-240 bridge (Ward 4)
Alteration
Conception
$1,600,000 est. value
Oklahoma City, OK 73195

Widen, Resurface and Bridge - US 177
Renovation, Infrastructure
Design
$13,500,000 est. value
OK

Fy23 Asphalt Resurfacing Project
Alteration
Post-Bid
Marlow, OK

Resurface (Asphalt) US-83: From 6.25 Miles North of the Sh-3 Junction, Extend North Near Turpin
Results
Turpin, OK

SE 104, Henney to Choctaw Rd - SE 104th St from S Henney Rd to S Choctaw Rd (Ward 4) - City of Oklahoma City
Infrastructure
Conception
$545,000 est. value
Oklahoma City, OK 73195

Last Updated 07/21/2022 12:35 AM
Project Title

Resurface (Asphalt) - US-75

Physical Address View project details and contacts
City, State (County) Henryetta, OK 74437   (Okmulgee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $5,418,518 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface (Asphalt) Us-75: From 0.43 Miles North of the Us-266 Junction, Extend North Near Henryetta. Project Length = 4.840 Miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents