Similar Projects
LED Traffic Signals
Bidding

Traffic Signal Upgrades at Edgewood Avenue/East Swissvale Avenue and Maple Avenue
Post-Bid
Edgewood, PA

Housing Units for Lights and Mounting Hardware
Post-Bid
Pittsburgh, PA 15226

Design Activities are Limited to: Concrete Curb Ramps, Utility Coordination
Results
$15,000,000 to $19,999,999 est. value
PA

Advanced Traffic Management System
Term Contract
Results
$4,872,319 est. value

Misc. Traffic Control Devices
Term Contract
Post-Bid

Penn Hills Signal Replacement Project
Results
Penn Hills, PA 15235

Traffic Signal at the Intersection of Freeport Road and Dutilh Road/Sheraton Drive
Post-Bid
Wexford, PA

Route 50 and Alpine Road Signal Installation
Results
Less than $281,775 est. value
Morgan, PA 15064

Traffic Improvements of Ewing Road at Cherrington Parkway at Pittsburgh International Airport
Post-Bid
Pittsburgh, PA 15231

Design Activities Are Limited to: Traffic Control Plan
Results
$50,000,000 to $59,999,999 est. value
Aspinwall, Fox Chapel, Pittsburgh, Sharpsburg, PA 15238

Arle Traffic Signal Upgrade Projects Pittsburgh Street and James Street and Pittsburgh Street and School Street
Post-Bid
Springdale, PA 15144

Warrendale Road and Franklin Road Signalization
Results
$200,000 to $250,000 est. value
Wexford, PA 15090

Washington Road and Bower Hill Road Traffic Signal and Roadway Improvements
Post-Bid
Pittsburgh, PA 15221

Design activities are limited to: Temp. Traffic Signal
Results
$10,000,000 to $12,499,999 est. value
Bridgeville, PA

Reported 04/27/2021 12:00 AM
Project Title

Bridge Inspection Access Equipment and Maintenance and Protection of Traffic Services

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15219   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $15,000 to $30,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The inspection is anticipated to begin in either May or June 2021 and will continue for four (4) days. GAI will require the services of a qualified Contractor to provide access equipment, safety equipment, maintenance and protection of traffic (MPT), and other bridge inspection-related equipment and services.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents