Similar Projects
HVAC Maintenance and Repair Services
Term Contract
Bidding
LA

HVAC Maintenance and Repair Services
Term Contract, Alteration
Bidding
LA

A/C and Heat Window Units
Alteration
Post-Bid
LA

Heating/Air System Service
Alteration
Post-Bid
New Orleans, LA 70122

HVAC Preventive Maintenance
Results
Tampa, FL - Baton Rouge, New Orleans, LA - Austin, Benbrook, El Paso, Fort Worth, Haltom City, Horizon City, Houston, Kyle, Odessa, Pflugerville, Round Rock, San Antonio, Socorro, TX 78227

Heating Ventilating and Air Conditioning Mechanical and Building Automation Services
Alteration
Results
New Orleans, LA

Upgrades and Replacement of HVAC System at Pittman Elementary School
Alteration
Bidding
Harvey, LA 70058

Henry Allen School Chiller Replacement
Addition
Post-Bid
New Orleans, LA 70115

Port-Wide Heating Ventilating and Air Conditioning (HVAC) Services
Alteration
Results
New Orleans, LA

HVAC Systems Maintenance and Repair for the Public Works Eastbank Warehouse
Term Contract
Bidding
LA

Joe Bartholomew Golf Course HVAC Service
Alteration
Post-Bid
New Orleans, LA

Amazon Exhibit Air Handler Unit
Alteration
Results
New Orleans, LA 70130

HVAC Systems Maintenance and Repair for the Public Works Westbank Warehouse
Term Contract
Bidding
LA

HVAC/Mechanical for Diagnostic Inspections and Repairs or Replacement
Alteration
Post-Bid
LA

Jourdan Road Terminal Cold Storage Expansion Refrigeration System Supply and Installation
Alteration
Results
New Orleans, LA 70126

Reported 03/19/2022 12:00 AM
Project Title

Cooling Tower Cleaning

Physical Address View project details and contacts
City, State (County) New Orleans, LA   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning of five (5) of MSY’s North Terminal Cooling Towers • Lock out and tag out electrical power supply to cooling tower-5 each • Isolate water flow to tower with assistance of Stationary Engineers-5 each • Clean cooling tower with water pressure, chemical and manual labor-5 each • Utilize lift machinery and generator power as needed • Clean fill, sump-5 each • Remove debris and accumulated scale-5 each • Provide scale and debris sample to customer for analysis

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents