Similar Projects
Deer Valley Water Treatment Plant Rehabilitation
Addition
Bidding
$32,000,000 est. value
Phoenix, AZ 85051

Neely WRP Facility Rehabilitation
Post-Bid
Gilbert, AZ 85233

Water and Water Reclamation Plant Facilities Construction Services
Post-Bid
Mesa, AZ 85211

Waste Water Treatment
Results
Luke Air Force Base, AZ 85309

Construction Manager at Risk Services for Water Reclamation Facility Improvements
Results
Chandler, AZ 85225

Cattail Cove State Park- Construction of Water and Wastewater Treatment Systems
New Construction
Post-Bid
Phoenix, AZ 85085

Citywide Water Resources Water Treatment
Term Contract
Results
Less than $15,000,000 est. value
Scottsdale, AZ 85258

Y--GRCA 229035 - Phantom Ranch WWTP - St Improvements
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value

Water Facilities Rehabilitation and Replacement CMAR Pre-Construction
Renovation
Results
$27,000,000 est. value
Phoenix, AZ

Construction Manager at Risk Project at NWTP South Reservoir Water Quality Improvements
Post-Bid
Gilbert, AZ 85234

Union Hills Water Treatment Plant Rehabilitation 2020 CMAR
Results
Phoenix, AZ 85024

NWTP Alternatives Evaluation and Construction
New Construction
Post-Bid
Gilbert, AZ

Northwest Water Reclamation Plant (NWWRP) Process Improvements
Results
$28,600,000 est. value
Mesa, AZ 85201

Arsenic Filter Media Replacement for Luke AFB
Post-Bid
Luke Air Force Base, AZ

Beardsley Water Reclamation Facility Expansion (Design-Build)
Results
Less than $29,100,000 est. value
Peoria, AZ 85345

Last Updated 06/08/2021 04:07 PM
Project Title

Pecos Surface Water Treatment Plant SCADA Upgrade

Physical Address View project details and contacts
City, State (County) Chandler, AZ 85286   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major tasks include; Upgrade legacy hardware and software as well as unify control hardware across all networks. Further detail for the project includes the replacement of control panels and controllers with standardized programmable logic controllers (PLC), cabinet replacements, procurement and installation of new virtual machine servers, software packages, Win911 applications with cellular modem and domain servers, and creation of SCADA software screens. Assess remote site communication (radio) equipment and upgrade/replace as needed. Provide options for redundant communication with remote sites. Relocate the SCADA operations control room to a new location downstairs in the Pecos Administration building.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents