Similar Projects
SE Regional Pump Station and Force Main - East of Route 1 - City of Milford
Infrastructure
Conception
$1,500,000 CJ est. value
Milford, DE 19963

Runway 4-22 Taxiway B - Sussex County
Infrastructure
Conception
$9,750,000 CJ est. value
Georgetown, DE 19947

Turnberry - Unity Branch Subdivision
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Harbeson, DE 19951

Royal Farms #428 / Milton
New Construction, Infrastructure - 5,100 SF
Design
$1,400,000 CJ est. value
Milton, DE 19968

Williams Conference Center Expansion
Addition, Demolition, Renovation, Infrastructure - 3,390 SF
Bidding
$1,377,880 CJ est. value
Georgetown, DE 19947

Open End, Thin Lift Bituminous Overlay, South, FY23-FY24
Infrastructure
Bidding
$500,000 CJ est. value
Bridgeville, DE 19933

HO Brittingham Elementary Demo/Sitework
Infrastructure
Post-Bid
Milton, DE 19968

KAMM Properties Site Development
New Construction, Infrastructure
Post-Bid
Bethany Beach, DE

Paving Street in Shipbuilders Village
Results
Milton, DE 19968

Pave and Rehab, Sussex IV (Millsboro - SR24, Washington and Main St) 2019
Results
Millsboro, DE 19966

Dairy Queen At Georgetown Plaza
New Construction, Infrastructure - 2,279 SF
Construction
$700,000 CJ est. value
Georgetown, DE 19947

Magnolia Street Parking Lot and Bulkhead Rehabilitation
Infrastructure
Construction
$1,246,714 CJ est. value
Milton, DE 19968

Black Hog Village Retail
New Construction, Infrastructure - 21,818 SF
Pending Verification
$4,000,000 CJ est. value
Lewes, DE 19958

Black Hog Village Retail
New Construction, Infrastructure - 21,818 SF
Pending Verification
$4,000,000 CJ est. value
Lewes, DE 19958

Inland Bay Regional Wastewater Facility (IBRWF) - Loop Project - Sussex County
Infrastructure
Conception
$6,500,000 CJ est. value
Millsboro, DE 19966

Last Updated 09/26/2022 06:03 AM
Project Title

SR 24, Love Creek to Mulberry Knoll

Physical Address View project details and contacts
City, State (County) Millsboro, DE 19966   (Sussex County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements consist of furnishing all labor and materials for this project which involves safety and operational improvements on SR24 from the Love Creek bridge to the limits of the SR 24, Mulberry Knoll to SR 1 project improvements (Contract #T200411209). Stormwater management and multi-modal facilities will be installed throughout the project limits. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. LOCATION: Sussex County PRE-BID MEETING: No All work on this contract must be complete within 243 Calendar Days. The Contract Time includes an allowance for 36 Weather Days. The Department's intent is to issue a Notice to Proceed for work to start on or about February 2023. A Partial Notice to Proceed for preordering is anticipated for September 2022. E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. Questions and responses are posted at bids.delaware.gov, and bidx.com/de/. The date of the final posted Questions and Answers document must be entered on the submitted Certification Form. Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. DelDOT to include a performance-based rating system for contractors. The Performance Rating for each Contractor shall be used as a prequalification to bid at the time of bid. Refer to 'General Notices' for details. DE DOT - SR 24, Love Creek to Mulberry Knoll

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents