Similar Projects
Rockingham Road Retail Building
New Construction, Infrastructure - 40,000 SF
Conception
$10,500,000 CJ est. value
Auburn, NH 03032

McAuley Commons Phase II
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Windham, NH 03087

74 Rockingham Road Residential Development
New Construction, Infrastructure - 13,816 SF
Design
$48,000,000 CJ est. value
Derry, NH 03038

PMG - South Broadway / Salem
New Construction, Infrastructure - 3,100 SF
Design
$1,000,000 CJ est. value
Salem, NH 03079

Sludge Thickener Upgrade
Infrastructure
Bidding
$400,000 CJ est. value
Newmarket, NH 03857

Sewer Main Lining
Infrastructure
Bidding
$200,000 CJ est. value
Salem, NH 03079

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Main Improvements 2021
Infrastructure
Post-Bid
Derry, NH

Water and Sewer Utility Improvements
Results
Less than $4,600,000 est. value
Newmarket, NH

Replacement of High School Water Controls
Infrastructure
Results
Raymond, NH 03077

Sitework for 2 Retail Buildings
New Construction - 11,225 SF
Construction
Epping, NH 03042

Kelly's Roast Beef / Salem
New Construction, Infrastructure - 4,122 SF
Construction
$1,300,000 CJ est. value
Salem, NH 03079

North Broadway Gas Station And Convenience Store
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Salem, NH 03079

70 Range Road Multi-Tenant Commercial Building
New Construction, Infrastructure - 7,068 SF
Pending Verification
$1,500,000 CJ est. value
Windham, NH 03087

School Street Area Reconstruction - Town of Exeter
Infrastructure
Conception
$4,900,000 CJ est. value
Exeter, NH 03833

Last Updated 11/10/2022 05:07 PM
Project Title

Court Street Pump Station Upgrades - Town of Exeter

Physical Address View project details and contacts
City, State (County) Exeter, NH 03833   (Rockingham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $5,190,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Court Street sewage pump station pumps sewage from the Linden and Court Street areas to the higher elevation gravity sewers located on High Street and the Pine Street and Court Street intersection. The station pumps use an older 6 inch 870 foot long force main (FM) to Pine Street and a newer 5,000 foot long 10 inch FM to the High Street and Gilman Lane manhole. During the April 2017 High Street sewer collapse, the 6 inch FM was used versus the regularly used 10 inch FM. This was very beneficial as it reduced the sanitary sewer overflow (SSO) at Gilman Lane, and the sewage volume pumped to the damaged High Street gravity sewer. However, the older 6 inch pipe was very restrictive and the three pumps strained to keep up with flow due to the restricted 6 inch size with a SSO nearly occurring. This proposed project would increase the FM size to Pine Street to either 8 inches or 10 inches. A process known as pipe bursting could be used to enlarge the existing line in place, or a new 8 inch or 10 inch directional bored pipeline could be installed. The 10 inch directional bore option, while more costly, is preferable as it entails less risk than pipe bursting and provides a desirable larger diameter FM pipe. Recent sewage collection system events, such as the High Street sewer collapse, have shown that proactive upgrades of infrastructure are less costly than reactive projects. As October 27, 2022, this project is currently in the FY 2023-2028 Capital Improvement Plan. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents