Similar Projects
HVAC Maintenance Services
Term Contract
Design
Downingtown, Hatboro, Philadelphia, PA

Great Valley School District 5/6 Center - HVAC Construction
Alteration
Bidding
$5,000,000 est. value
Malvern, PA

HVAC and Mechanical Products
Term Contract
Post-Bid

J041--Exhaust Hood Cleaning
Post-Bid
Coatesville, PA 19320

A/C Upgrade at Beaumont Elementary School and & Valley Forge Elementary School
Results
Berwyn, Wayne, PA 19312

Z--Hofu Upgrade HVAC ,Paint & ore Museum Collection
Results
$1,000,000 to $5,000,000 est. value
Elverson, PA

Boiler Replacement
Renovation
Post-Bid
Pottstown, PA

Renovate and Expand Amos Hall - Lincoln University - HVAC Construction
Results
$2,000,000 to $3,000,000 est. value
Lincoln University, PA 19352

H241--Exhaust Hood Cleaning
Post-Bid
Coatesville, PA 19320

Multi Purpose Room RTU Replacement
Results
West Chester, PA 19380

Southeast PA Veterans Center - HVAC Controls and Chiller Maintenance
Term Contract
Post-Bid
Spring City, PA 19475

HVAC Water Treatment System Maintenance 2021-2022
Term Contract
Results
Less than $21,000 est. value
Exton, PA 19341

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Renovations and Upgrades
Results
Berwyn, Devon, Wayne, PA 19312

On Call HVAC Services - Southeastern Pennsylvania Veterans Center (SEVC)
Alteration
Post-Bid
Spring City, PA 19475

Last Updated 05/06/2022 03:40 AM
Project Title

Recitation Hall Water Source Heat Pump Replacement

Physical Address View project details and contacts
City, State (County) West Chester, PA   (Chester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,475,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work included under this Project consists of, but is not limited to, removal and replacement of the geothermal heat pump installed in the basement mechanical room at Recitation Hall. The associated pumps and variable frequency drives (VFDs) shall be removed and replaced with new pumps and VFDs. The controls shall be modified and updated to control all new equipment and some existing equipment. The piping shall be removed and replaced as noted on the contract drawings. One two control valve at AHU-1 shall be removed and replaced with a three way control valve. Refer to contract drawings for any additional scope not mentioned above.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents