Similar Projects
West Access Road and Waterline Improvements
Bidding
Eagle Mountain, UT 84005

Lindon City Culinary Waterline Replacement Project - Geneva Road
Post-Bid
Lindon, UT

Sandpit Transmission Pipelines Project
Post-Bid
Less than $3,000,000 est. value
Lehi, UT

2018 PRV Vaults
Results
UT

Construction of the 2018 Culinary Waterline Replacement Project Phase 7
Results
American Fork, UT

Water Line Pipe and Fittings
Post-Bid
Provo, UT

Construction of the American Fork City - American Fork Canyon Water Line
Results
Less than $3,163,132 est. value
American Fork, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

Foothill Waterline Project
Results
Less than $1,100,000 est. value
Mapleton, UT

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Battle Creek Springs Rehabilitation
Results
Less than $2,180,410 est. value
Pleasant Grove, UT

Spanish Fork Jr High Transportation Corridor Phase 1
Post-Bid
Less than $1,600,000 est. value
Spanish Fork, UT 84660

State Street Water Line 470 West to 300 West
Results
Less than $425,190 est. value
American Fork, UT

Pressurized Irrigation Metering Project
Post-Bid
Lehi, UT 84043

Spring Creek Place Water Pipeline Replacement
Results
Springville, UT

Reported 08/27/2019 12:00 AM
Project Title

Z--Pao Domestic Water Heater System Replacement

Physical Address View project details and contacts
City, State (County) Provo, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replace the existing water heaters in the Janitorial Closet with one, Energy Star certified water heater to provide hot water for Water Lab, Break Room and four eastern restrooms. Install point-of-use, tankless electric water heaters in the two west restrooms, in the USDA Breakroom, and for the three sinks in the Materials Lab. Replace the hot water lines from the central water heater to faucets and remove all extraneous hot water lines from the building.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents