Similar Projects
109th Avenue Roadway Improvements - Village of Pleasant Prairie
Infrastructure
Conception
$500,000 est. value
Pleasant Prairie, WI 53158

Paving Projects - Golf-7 - County of Kenosha
Infrastructure
Conception
$390,000 CJ est. value
Kenosha, WI 53140

Sun Pointe Village - Phase 3 / Kenosha
New Construction, Infrastructure
Design
$9,000,000 CJ est. value
Kenosha, WI 53140

Sun Pointe Village - Phase 3 / Kenosha
New Construction, Infrastructure
Design
$9,000,000 CJ est. value
Kenosha, WI 53140

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2022 Paving Program Utility Adjustment and Curb Repair
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Kenosha County Administration Building Parking Lot
Infrastructure
Results
Kenosha, WI 53140

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

14th Avenue Apartments / Kenosha
New Construction, Infrastructure
Pending Verification
$16,500,000 CJ est. value
Kenosha, WI 53143

14th Avenue Apartments / Kenosha
New Construction, Infrastructure
Pending Verification
$16,500,000 CJ est. value
Kenosha, WI 53143

New Petrifying Springs Pavilion - Parks-17 - County of Kenosha
New Construction, Infrastructure
Conception
$800,000 CJ est. value
Kenosha, WI 53144

Horizon Park - PK-20-004 - City of Kenosha
New Construction, Infrastructure
Design
$1,648,000 CJ est. value
Kenosha, WI 53142

2022 Paving Program Phase 1
Term Contract, Infrastructure
Post-Bid
Pleasant Prairie, WI 53158

Last Updated 05/09/2023 10:34 AM
Project Title

Antioch Rd, Antioch - Burlington; Il State Line To Sth 50

Physical Address View project details and contacts
City, State (County) Salem, WI 53168   (Kenosha County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

20230509015 3380-06-70 WISC 2023367 Antioch Rd, Antioch - Burlington, Il State Line to STH 50, STH 083 Kenosha County Milling, Base, Asphalt Pavement, Curb and Gutter, Sidewalk, Storm Sewer, Signs, Pavement Markings, Traffic Signals, Street Lighting. Work Type: AD Working Day Contract: 60 Days Estimated Range - $5,000,000 - $5,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - Antioch Rd, Antioch - Burlington, Il State Line to STH 50, STH 083 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents