Similar Projects
Last Updated | 08/18/2022 09:32 AM |
Project Title | Honeywell Golf Club Road Improvements |
Physical Address | View project details and contacts |
City, State (County) | Wabash, IN 46992 (Wabash County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $210,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Proposals received after 4:00 PM August 25, 2022 will be returned unopened. Bids shall be submitted in an enclosed opaque sealed envelope, marked "CITY OF WABASH HONEYWELL GOLF CLUB ROAD IMPROVEMENTS". Bids will be evaluated and may be held up to ninety (90) days. It is the intent that an award, contracts, and Notice to Proceed will be executed and issued in early fall, and final completion by June 16, 2023. The scope of work will include construction and/or improvements for road reconstruction, curb face sidewalk, ADA curb ramps, drainage improvements, related appurtenances, and site restoration. In general, this includes reconstruction of approximately 1360 linear feet (+/-) of Golf Club Road from Studio Lane to State Route 15 in Wabash, Indiana. The work to be performed and the bids submitted, including any and all separate and combination bids, shall include sufficient and proper sums for all General, Construction, Mechanical, Electrical, Installation, Labor, Materials, Tools, Equipment, Taxes (both Federal and State), Permits, Licenses, Insurance, Service Costs, and so forth, incident to and required for the construction of the facilities. All materials furnished and labor performed incident to and required for the proper and satisfactory execution of the contracts shall be furnished and performed in accordance with the requirements of the contract documents as defined in the General Conditions of the Construction Contract, and any addenda thereto, prepared by the Engineer, DLZ Indiana, LLC. Each bid shall be accompanied by a Certified Check or acceptable Bidder's Bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate proposal, which check or bond will be held by the Owner as evidence that the Bidder will, if awarded a contract or contracts, enter into the same with the Owner upon notification from him to do so within thirty (30) days of said notification. Approved Performance and Payment Bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of each Contractor at the time of contract execution. The bond will be in the amount of on hundred percent (100%) of the contract price and must be in full force and effect for a period of twelve (12) months from the date of written acceptance of and final payment of the work. Failure to execute a contract and to furnish a Performance and Payment Bond as hereinafter set out will be cause for forfeiture to the Owner of the amount of money represented by the Certified Check or Bidder's Bond, as and for liquidated damages. Bids shall be properly and completely executed on bid forms provided by the Engineer which shall include the Non-Collusion Affidavit. Each bid shall also include the revised Indiana Questionnaire Form No. 96, all as required by Statute. No bids shall be withdrawn after the opening of bids without the consent of the Owner for a period of ninety (90) days after the scheduled time of receiving same. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make combination of bids as may seem desirable, and to waive any and all informalities in the bidding. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |