Similar Projects
Last Updated | 11/24/2020 01:45 PM |
Project Title | Midway KV1A Replacement |
Physical Address | View project details and contacts |
City, State (County) | Colorado Springs, CO (El Paso County) |
Category(s) | Industrial/Manufacturing |
Sub-Category(s) | Electric Substation |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | MIDWAY SUBSTATION KV1A REPLACEMENT - contractor to provide all the labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The work includes Removal of four single-phase transformers and associated hardware, remove two reactor base and hardware, remove one power circuit breaker, provide foundation, conduit, conductor and cables for the new 200 MVA transformer, install ground fault detection system and tertiary, upgrade one 115-kV bay including three disconnect switches. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |